1 / 31

PDR PRESENTATION

PDR PRESENTATION. Montgomery, AL. John Mathews Architectural/Structural Derek Sears Foundation Michelle Bailey Fluid Systems Clem Pin Building Thermal Systems Andrew Coulter Solar Thermal Systems. FLOOR PLAN LAYOUT- OPTION 1. 1 st floor. 2 nd floor. Basement.

lavi
Télécharger la présentation

PDR PRESENTATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PDR PRESENTATION Montgomery, AL. John Mathews Architectural/Structural Derek Sears Foundation Michelle Bailey Fluid Systems Clem Pin Building Thermal Systems Andrew Coulter Solar Thermal Systems

  2. FLOOR PLAN LAYOUT- OPTION 1 1st floor 2nd floor Basement

  3. FLOOR PLAN LAYOUT-OPTION 2 1st Floor 2nd Floor Basement

  4. ROOF TRUSS CONSIDERATIONS • Information Used In Analysis • Roof Structure • Standard Roof Sizes • Tiles • Factor of Safety Used • No attic necessary • Solar Panels • Most efficient between 30-40° • Each weighs around 80 lbs • Could have up to 4 solar panels • Each solar panel has a surface area of 4ft x 6ft • Environment • .2” of snow fall is the maximum ever recorded • Winds could reach up to 206 mph (F3 tornado) • Montgomery County has had 15 tornadoes since 1956

  5. ROOF TRUSS LIMITS • Beam Forces • Maximum bending stress of material is 1650 lbs/ft² • Maximum compressive stress is 1700 lbs/ft² • Forces on trusses • Flat Plate Collectors • F=3.33lbs/ft² • Forces in the negative y-direction • Plywood • F=2.15625 lbs/ft² • Force in the negative y-direction • Shingles • F=.304 lbs/ft² • Force in the negative y-direction • Wind F=.00256V² • F=102.4 lbs/ft² • Force in the x-direction

  6. ROOF TRUSS DATA COLLECTION • Factor of Safety (FOS) turns out to be 4.7 • Beam Loading(2”x12”) • Compressive loading failure is 24225 lbs • Bending moment failure is 313680 lbs-inches • Worst Case Scenario Calculations • Compressive load is 546.465 lbs • Bending moment is 66667 lbs-inches

  7. WALL CROSS-SECTION

  8. WALL INSULATION

  9. ATTIC INSULATION

  10. WINDOWS AND DOORS • Windows - Use lowE2 glass - U value of .36 • Doors • Patio Doors - use lowE2 glass - U-value of .35 • Front Door - insulated metal with a wood print - U-value of .26

  11. SOLAR WATER HEATING SYSTEMS • Hydronic System Analysis • Closed loop – Active system • Potable water routed to storage tank • Working Fluid circulates through collectors • Potable water is heated through heat exchanger • System requires auxiliary components like expansion tank, valves, etc.

  12. BASIC ILLUSTRATION

  13. MAJOR COMPONENTS ANALYZED • analysis & selection of suitable pump • selection of appropriate heat exchanger • selection of main water storage tank. • primary plumbing components – pipes For Each: • options, benefits and costs analyzed

  14. HYDRONIC SYSTEM PUMP ANLAYSIS • How the analysis was carried out : • Design analysis was based on Architectural & Solar Thermal systems & options were considered • Architectural: basement & overall house dimensions • Solar Thermal: two possible options of Flat Plate Collectors with varying flow rates, dimensions and pressure losses. • Result of Total System Head Loss :

  15. OPTIONS FOR MAIN PUMP • Grundfos UP Series Circulator • Stainless steel protects against corrosion • 3 Speed Super-Brute technology • Integrated removable check valve • Highest starting torque in its class • Quick connecting terminals • 3 yr warranty • Cost: $200-$400

  16. PUMP PERFORMANCE CURVE CLOSED SYSTEMS-UP SERIES

  17. BELL & GOSSETT WET ROTOR CIRCULATORS • Heat resistant, polypropylene impeller with closed design improves operating efficiency • Dura Glide Bearing System incorporates several components working together to eliminate seasonal freeze-up • Face plate and rotor sleeve feature corrosion resistant stainless steel • Cost : $100 - $300

  18. PUMP PERFORMANCE CURVEWET ROTOR CIRCULATOR – NRF SERIES

  19. HEAT EXCHANGER GEA FP HYDRONIC SERIES • Grazed Flat Plate • 3”X 8”, 14 plates, 8 GPM @ 5 Psi PD • Higher heat transfer co-efficient • High pressure ratings • Smaller size & weight • Cost: $200

  20. STORAGE TANK W/INTEGRATED HXSOLARIDE HE SERIES • Heat exchanger: copper tubing wrapped & secured to the tank. • Double wall, vented design for leak detection • Anode rod equalizes aggressive water action for prolonged tank life • Temperature and pressure relief valve included • Max Pressure 150 Psi • Pressure Drop thru coil @ 2Gpm is 4.8 ft • Cost : $1700, 6 yr Limited Warranty

  21. PLUMBING PIPES • PVC • Resistant to corrosion & abrasion • Lightweight, high impact strength • No water hammer • Easy, cost-effective installation compared to copper • Relative price stability over time • Cost: 3/4 In. x 10 Ft. PVC @ $2 • COPPER • Impermeable to contaminants & Biostatic • Will not burn or give off toxic fumes when exposed to fire • Withstand rapid temperature & pressure changes • Can leach lead/copper into water supply • Cost :Cerro 3/4 “ x 10 Ft. @ $18

  22. Flat Plate Solar Collector – Sunmaxx M2 Thermal f-value Output

  23. Flat Plate Solar Collector – Sunmaxx M2 21.53 ft2 aperture area 0.35 gpm flow rate Lower cost Smaller surface area and slower flow rate produce less hot water than SH Would handle 39.4% of hot water needs

  24. Flat Plate Solar Collector – Enerworks SH10US Thermal f-value Output

  25. Flat Plate Solar Collector – Enerworks SH10US 28.97 ft2 aperture area 0.52 gpm flow rate Higher cost Higher flow rate and larger surface area produce more hot water than M2 Would handle 47% of hot water needs

  26. Foundations

  27. Strength vs. Wall Thickness

  28. Cost vs. Wall Thickness

  29. REFERENCES Window information http://www.americancraftsmanwin.com/productDetail.cfm?MID=1200&cat=RP&type=double Cellulose Insulation Specification Sheet http://www.homedepot.com/catalog/pdfImages/81/8123987d-90ca-46d2-b21f-dcf0a2ebe578.pdf Fiberglass Information http://www.homedepot.com/Building-Materials-Insulation-Fiberglass-Rolls/h_d1/N-5yc1vZ1xihZbay7/h_d2/Navigation?&storeId=10051&catalogId=10053&langId=-1 Shingle Data http://bestmaterial.com/detail.aspx?ID=16297 Lumber Data http://www.fpl.fs.fed.us/documnts/fplgtr/fplgtr113/ch06.pdf http://www.fpl.fs.fed.us/documnts/fplgtr/fplgtr07.pdf

  30. REFERNCES – FLUID SYSTEMS • Pumps & Performance Curves www.grundfos.us/ & www.bellgossett.com/ • Heat Exchangers & Specifications http://www.gea-phe.com/usa/themes/products/brazed-plate-heat-exchangers-ecobraze/gbx-series/ & http://www.rheem.com/products/tank_water_heaters/ • Plumbing Pipes http://www.copper.org/Applications/plumbing/techref/guidespecs/gde_specs_main.html & homedepot.com REFERNCES – Solar Thermal Sunmaxx http://www.siliconsolar.com/visual-directory/flat-plate-solar-collectors.html Enerworks http://www.enerworks.com/

  31. References- Foundations Foundations Building http://www.ornl.gov/sci/roofs+walls/foundation/ORNL_CON-295.pdf R-values for Concrete http://www.allwallsystem.com/design/RValueTable.html Wage Estimates http://www.bls.gov/oes/2008/may/naics5_238110.htm Conrete Cost Estimates http://www.cabq.gov/purchase/staff-commodity-assignments/purbch/concrete-ready-mix/Concrete%20Ready%20Mix Soil Density ftp://sidads.colorado.edu/pub/DATASETS/AVDM/data/soil_moisture/SMEX03/Alabama/ground_soil_moisture/regional_GSM/BD_AL_v2.txt

More Related