320 likes | 427 Vues
Experience the remarkable transformation of our classroom spaces during the Summer 2013 renovation project. This project included complete overhauls of multiple classrooms, each captured in before-and-after visuals. Highlights include updated paint schemes, new furniture, and redesigned study spaces tailored for student engagement. From the Veterans Tower to the 3rd floor study areas, every corner of the learning environment has been reimagined to foster an inspiring academic atmosphere. Discover how these renovations enhance the student experience.
E N D
Classroom Renovation Project Summer 2013
RB 130 COMPLETE RENOVATION BEFORE AFTER
RB 140 COMPLETE RENOVATION BEFORE AFTER
PAINT HM 230 AFTER BEFORE
PAINT HM 260 BEFORE AFTER
PAINT GL 137 BEFORE AFTER
PAINT GL 139 BEFORE AFTER
PAINT GL 165 BEFORE AFTER
PAINT GL 166 AFTER BEFORE
EC 3rd FLOOR STUDENT STUDY SPACE BEFORE AFTER
EC 3rd FLOOR STUDENT STUDY SPACE BEFORE AFTER
VETERANS TOWER BEFORE AFTER
VETERANS TOWER BEFORE AFTER
VETERANS TOWER BEFORE AFTER
VETERANS TOWER BEFORE AFTER
GL HUB BEFORE AFTER
GL HUB BEFORE AFTER
GL HUB BEFORE AFTER
GL HUB BEFORE AFTER
GL HUB AFTER
BIX SEATING BEFORE
BIX SEATING BEFORE AFTER
TV SEATING BEFORE
TV SEATING AFTER BEFORE
4th FLOOR CHAIRS BEFORE
4th FLOOR CHAIRS BEFORE AFTER
SEATS HM 260 AFTER BEFORE
PC 2nd FLOOR LOBBY CHAIRS AFTER BEFORE
SEAT CUSHIONS AC1 264 AND 265 AFTER BEFORE