1 / 14

International Civil Aviation Organization

International Civil Aviation Organization. GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May 2002. Presentation GNSS 4.3 by E. Chatre. GALILEO Overview High Level Architecture Consist of 30 (27+3) satellites and associated ground infrastructure

leo-gentry
Télécharger la présentation

International Civil Aviation Organization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May 2002 Presentation GNSS 4.3 by E. Chatre

  2. GALILEO Overview • High Level Architecture • Consist of 30 (27+3) satellites and associated ground infrastructure • Best solution in terms of robustness and performance homogeneity, including northern latitudes • Use CDMA signals on 4 frequencies • Offer different services (OS-SoL-CS and PRS + SAR) • Implement concept of Global Integrity • Certify system performance • Fully Operational by 2008

  3. Space Segment • Constellation Configuration

  4. Signal Baseline • Open and Safety Of Life Signals

  5. Space Segment • Constellation Performance • Horiz accuracy around 4m (95%) • Vertical accuracy around 8m (95%)

  6. GALILEO In Flight Configuration Navigation payload: 70-80 Kg / 850 W Search and Rescue (SAR) transponder: ca. 20 kg Overall Spacecraft: 650 Kg / 1.5 kW class Launcher Options: Ariane, Proton, Soyuz, …... Space Segment • Satellite Payload

  7. Ground Segment • Overview

  8. GALILEO Ground Control Stations for illustration only

  9. GALILEO LOCAL COMPONENTS CORE SYSTEM MEO CONSTELLATION IMS Local Infra- struct. regional uplink Network IULS …. REGIONAL NAV SIS NAV SIS Communication link COMPONENTS ICC NAV SIS NAV SIS . . . . . . S-band uplink C-band uplink GSS Network IMS Network Local Infra- struct. TTC uplink Mission uplink ICC Communication link INTEGRITY DETERMINATION NAVIGATION CONTROL & IMS & DISSEMINATION CONSTELLATION MANAGEMENT GCC L-band UHF NAV SAR USER SEGMENT External COSPAS-SARSAT Complementary GROUND SEGMENT Systems System Boundaries

  10. Local Elements • Viewed as an integral part of the overall system -Recognised that a great many applications will require Local Elements i.e. Category III landing - Existence of capabilities considered and defined within the High Level documents of GALILEO • Local services may be offered by the Galileo Operating Company or external service providers • Possible to offer certified services where necessary • Demonstrators of Local Elements will form part of the GALILEO development process and indicate achievable performance levels

  11. Local Elements • Performance Enhancement in the following: • Position, Velocity, Time • Differential Code • Carrier - TCAR • Availability • Pseudolite • Integrity • Time To Alarn (TTA), and alam limit • Communication • Single or bi-directional • Voice, Data or Both • Local Elements will offer different combinations of these enhancements to different extents over different service volumes • Base level performances will be specified

  12. GALILEO Schedule • 4 Phases • Definition Phase • Upto end 2001 • Initial definition of the GALILEO requirements and architecture • Development and Validation • 2002 through 2005 • Consolidation of Mission Requirements • Development of satellites and ground based components • In Orbit validation • Deployment • 2006 through 2007 • Construction and launch of satellites • Installation of complete ground segment • Operations • 2008 onwards

  13. 80 M€ 1.250 B€ 2.150 B € 220 M€ p.a. 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 …. GALILEO Schedule DEF Initial Galileo Full Galileo DDV Operational Galileo Definition Phase LOR ... Design Development & In-Orbit Validation Phase Full Deployment Phase

  14. Summary • GALILEO a joint EU / ESA initiative • Unanimous support from both ESA and EU councils • EC politically responsible, ESA technically responsible • Builds upon existing European experience in field of GNSS (EGNOS) • Designed from a civilian perspective • Independent from, but interoperable with other systems • GPS, GLONASS, EGNOS, UMTS etc. • Brings additional robustness for civil aviation • Further information can be found at the following Web sites www.galileo-pgm.org www.esa.int/navigation

More Related