An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Set of priorities per WBS level 3 elements:(current numbering need to be mapped to new WBS version from Tim) (AD = member of wheels with oversight responsibility)(TL = technical leads of doing the work)

  2. Operate the TeraGrid 1.1.1 Network (AD: Tony, TL: Linda Winkler)a) Consummate contracts for CHI-SDSC linkb) Develop network failover plan (to Abilene) 1.1.2 Compute Systems (AD: Mike, TL: RP-Tech-Leads ?) <- Mike ?a) Deploy CTSS v3 1.1.3 Storage Systems (AD: Kelly, TL: Bryan Banister -WG chair)a) Upgrade GridFTP performance (deploy Caltech nodes) 1.1.8) Operations and QA (AD: Tony, TL: Tony's back pocket)a) Define what "Operations" is and what we're trying to doa) Create an operations dashboard 1.1.9) Allocations Management (AD: Tony, TL: Steve/Dave)a) Provide activation and usage interfaces to support User Portalb) Provide information needed for RAC meeting 1.2.1 Software Management (AD: Mike, TL: JP/Lee )a) Build and Test CTSS v3 by April 3 1.2.2) User access management (AD: Sergiu, TL: Eric R.)a) Provide easier and faster way for users to enable new accounts/access 1.2.3) Security (AD: Tony, TL: Jim Marsteller)a) Consolidate Policy status and finalize those “ripe”b) Consolidate the Community Account implementation 1.2.4) Verification and Validation Tools (AD: Mike, TL: ??) <- Mike ?a) Integrate and Validate new tests for CTSS v3 into INCA

  3. Communicate with Stakeholders 2.1) User Consulting (AD: Sergiu, TL: Rich Raymond)a) Improve the L/MRAC liaison bonding 2.2) Science Gateway Support (AD: Nancy, TL: Nancy)a) Develop a transition plan from dedicated support to support team 2.3) User Portal (AD: Sergiu, TL: Eric Roberts)a) Deploy v1 with account activation and usage summary capabilities 2.4) Help Desk (AD: Sergiu, TL: Mike Pingleton)a) Perform an effort analysis on expended effort for current support levels 2.5) Documentation (AD: Sergiu, TL: Diana Diehl)a) Provide documentation to support CTSS v3 and User Portal deploymentsb) Revise “Getting Started” and “Quick Start” guidesc) Figure out relationship with EOT 2.6) Training (AD: Scott, TL: Sandy Copius, Don Frederick, Sergiu)a) Consolidate list of activities for 2006b) Confirm SuperComputing 3-yr educational program 2.7) Outreach (AD: Scott, TL: Scott)a) Plan and conduct the 2006 “All Hands Meeting”b) Explore options for non-compute resources joining TG (e.g. Florida International Univ.) 2.8) External Relations (AD: Scott, TL: Scott, Faith)a) Hire webmaster and redesign websiteb) Produce TeraGrid article/special issue in e.g. ACMc) Produce TG highlights brochure

  4. Enhance the TeraGrid 3.1) Integration Tools (AD: Kelly, TL: Lee Liming ) <- Mike ?a) Deploy the Information Services Infrastructure 3.2) Data (AD: Kelly, TL: Bryan Banister)a) Improve striped GridFTP reliabilityb) Improve striped GridFTP performance 3.3) Computation (AD: Kelly, TL: ) <- Mike ? Mike Pingleton, Don Fredricksa) Generate charge and form coscheduling RAT 3.4) Science Gateway Prototypes (AD: Nancy, TL: Nancy)a) Develop audit strategy for gateways 3.5) Visualization (AD: Kelly, TL: Mike Papka, Kelly)a) Develop strategic plan for Visualization services/resources

  5. Manage the Project 4.1) System Architecture (AD: Dane, TL: wheels)a) Define baseline TeraGrid components and interfacesb) Consolidate and confirm policy documents and process 4.2) Internal Communications (AD: Scott, TL: Scott & Dane)a) Rationalize the communications tools/infrastructureb) Spread the corporate vision of the TeraGrid architecture 4.3) Project Controls (AD: Charlie & Dane, TL: ditto)a) Form the CUACb) Design and Conduct the 2006 User Survey 4.4) Project Planning (AD: Dane, TL: Dane)a) Complete the WBS process to fully loaded timelinesb) Define and iterate through process to integrate new resources into TeraGrid 4.5) Reporting (AD: Charlie/Tim, TL: Esleen)a) Debug Invoicing Process with GIG subawards