1 / 34

The Future of Groundwater Availability

The Future of Groundwater Availability. Jim Brasher – General Manager, Colorado County Groundwater Conservation District. August 8, 2011 – Colorado County Commissioners Court. Outline. Description of Aquifer Groundwater Usage Future Groundwater Usage Well Registration and Permitting.

leone
Télécharger la présentation

The Future of Groundwater Availability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Future of Groundwater Availability Jim Brasher – General Manager, Colorado County Groundwater Conservation District August 8, 2011 – Colorado County Commissioners Court

  2. Outline • Description of Aquifer • Groundwater Usage • Future Groundwater Usage • Well Registration and Permitting

  3. Major Aquifers of Texas

  4. Hydrologic Cross-Section

  5. 3-D Conceptual Model

  6. Pumpage versus Water Level Change Chicot Evangeline Jasper

  7. Pumpage versus Water Level Change Evangeline

  8. Summary of Gulf Coast Aquifer • Composed of Chicot, Evangeline and Jasper Aquifers (along with Burkeville Confining Unit) • Chicot is best and Jasper is poorest quality • Aquifers dip and thicken from NW to SE • Computer simulations can project aquifer conditions based on pumpage assumptions at future points in time

  9. Types of Groundwater Usage • Municipal or Public Supply • Domestic • Livestock • Commercial • Irrigation • Mining • Fracture Stimulation (Oil & Gas)

  10. Irrigation

  11. Colorado County Groundwater Usage

  12. Colorado County Groundwater Usage

  13. Ave water level of index wells (CBGCD) 2005 2006 2007 2008 2009 2010

  14. Future Water Usage • Up until recently: • High availability of Colorado River for irrigation • Abundant groundwater throughout the county • No accurate estimate of groundwater usage or availability because there was plenty of water • No regulation needed

  15. Region K Water Plan

  16. Projections of Irrigation Usage (Surface and Groundwater) (p) – denotes that only the portion of the county in Region K was considered Lower Colorado Regional Water Planning Group (Region K) – July 2010

  17. Projections of Municipal Usage (Surface and Groundwater) (p) – denotes that only the portion of the county in Region K was considered Lower Colorado Regional Water Planning Group (Region K) – July 2010

  18. Projections of Municipal Usage (Surface and Groundwater) (p) – denotes that only the portion of the county in Region K was considered Lower Colorado Regional Water Planning Group (Region K) – July 2010

  19. Future Groundwater Projections • Projected increase in population in Colorado County pales in comparison to Travis and surrounding counties • Colorado and surrounding counties will be viewed as prime areas to exploit for transport of water to urban areas! • LCRA-SAWS project was an example • $1.6 billion project underway to transport water to San Antonio from Gonzales County

  20. Future Groundwater Usage • Water will increasingly be treated as a commodity • Water marketers who can deliver water to urban areas will be well compensated • Result: • Is Regulation good or bad? • Prefer local or state control? • Do you risk having no regulation?

  21. CCGCD Rules & Regulations • Well Registration • Well Permitting • Production limits • Spacing requirements • Some metering • Data Acquisition

  22. Well Registration • Every water well (new and existing) must be registered • One-time procedure • No costs to the registrant

  23. Well Registration • Why do I have to register my well? • Protection from offset production. • Example: Water needs for hydraulic fracture stimulation for Eagle Ford Shale • Aquifer: Poorest area in the county for aquifer. Will need to access Evangeline and Jasper most likely. • Water Requirements: Small total amount needed, but VERY high rates • Potential Impact: Severe local drawdown of water table

  24. Well Registration • Why do I have to register my well? • Protection from offset production. • Protection in the event of contamination. • May be difficult to get your well serviced if well is not registered. • Can get a more accurate estimation of water usage for the District…underreporting usage means over-reporting availability.

  25. Well Registration • What happens if I don’t register my well? • CCGCD tries to highlight the advantages to the well owner of registering their well • District does have the power to fine well owners who refuse to register their wells

  26. Well Registration • Expect 3000 to 4000 wells in the District should be registered • Predict that 1500 to 2000 will be registered • Some residents are not aware of registration • Some civil disobedience • Deadline to register: September 15, 2011 • Board is likely to extend deadline • Forms available at District office or web-site (www.ccgcd.net)

  27. Well Permitting • Only a select few of the total wells registered will require a permit (estimate 5 – 10%) • The following are exempt from requiring a permit: • Domestic wells pumping < 50,000 gpd • Livestock wells pumping < 50,000 gpd • Rig supply wells for oil/gas E&P • Mining regulated by the Texas Railroad Commission • Abandoned wells

  28. Well Permitting • Examples of wells NOT exempted (i.e. will require a permit) • Irrigation wells (not including gardens & lawns) • Municipal/public supply wells • Wells used to supply rigs performing hydraulic fracture stimulation • Wells for gravel operations • Commercial wells (business & manufacturing)

  29. Well Permitting • Permits are typically of 3-yr duration • Amount of water designated for use can be used at any time during permit period • Permittees can apply for amendment to permit if more water may be required • Spacing from existing wells depends on the size of the well being permitted

  30. Well Permitting • Four types of Permits • Existing and Historic Use Permits • Operating Permits • Test Well Permits • Transport Permits • Depending on the size of the well, approval of the permits may be done by the General Manager, by the Board of Directors, or will require a public hearing

  31. Well Permitting • Permitted wells with greater than 6 inch casing diameter might require a meter • Essentially, only Class C wells will be metered • Domestic and livestock wells will NOT be required to have a meter!!! • State law • Practicality of metering thousands of wells

  32. Data Acquisition • A monitor well network has been set up to check monthly changes in water level

  33. Data Acquisition • A monitor well network has been set up to check monthly changes in water level • Pumpage and water level data will be incorporated into computer simulation models that help predict future aquifer conditions

  34. Questions?

More Related