20 likes | 117 Vues
Network engineering group Sohla, Astro-G plan to continue tests and simulations for data post-processing. Close cooperation with Graz for CPF file generation using TLE predictions enables tracking. Stations like WestPac, Reflector, CoROT show low accuracy with TB ±200 ms. During night, 10-50% of passes are trackable. Assistance provided for stations' upgrades in Korea and Metsahovi. Collaborative retro efficiency tests planned in Poznan, 10/2008, show Time Bias +46 ms, Range Bias +384 m with around 90,000 returns.
E N D
NEWG – Network & Engineering WG • Sohla, Astro-G: Data Post-Processing under discussion • To be continued; tests / simulations planned; • Close cooperation with • Graz: TLE predictions used to generate CPF files; allows tracking of • WestPac, Reflector, [CoROT], etc; low accuracy; TB 200 ms possible; • At least during night time: 10% to 50% of passes trackable • Herstmonceux: SR620 Cals, • Assistance for planned / upcoming / Upgraded stations: • Korea, Metsahovi • Ad hoc Group: Compass-M1 Retro Efficiency tests Poznan, 10/2008
Reflector: 2008/day 148 / 19:00 UTC (Night) Time Bias: + 46 ms; Range Bias: + 384 m; about 90.000 Returns Poznan, 10/2008