Protect & Restore Northeast Oregon/Southeast Washington

Protect & Restore Northeast Oregon/Southeast Washington. Project Number 2007-393-00 ISRP – Geographic Review May 1, 2013. 13.3 Million Acres. Nez Perce Tribe Treaty Territory. 3 States 6 National Forests 12 Counties. NE Oregon/SE Washington Overview. History.

lilia
Télécharger la présentation

Protect & Restore Northeast Oregon/Southeast Washington

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Protect & Restore Northeast Oregon/Southeast Washington Project Number 2007-393-00 ISRP – Geographic Review May 1, 2013

  2. 13.3 Million Acres Nez Perce Tribe Treaty Territory 3 States 6 National Forests 12 Counties

  3. NE Oregon/SE Washington Overview

  4. History • 2001-03 PCSRF funded for inventory work • BPA Project (Wallowa County Culvert Inventory) started in 2003 • Completed inventory, assessment and prioritization of fish passage structures in Wallowa County • Since NPPC Provincial Review process (2007), the project has been titled Protect and Restore Northeast Oregon • 4 proposals submitted for the northeast Oregon Project Area in 2007. • As a result of responding to previous ISRP comments and coordination with NPCC and BPA, all four proposals were combined into one project area covering all of the NPT Territory in northeast Oregon. • Objective was to coordinate with partners and seek addition funds for implementation of restoration work • Through negotiations with BPA in 2010 the project’s geographic area was expanded to include all of the NPT Territory in Washington State as well.

  5. Previous ISRP Concerns • Numerous project proposals were submitted in 2006 • Prioritized and combined

  6. BiOp Habitat Improvement

  7. Cost Share / Partners OREGON • Forest Service • Resource Advisory Committee (RAC) • Grande Ronde Model Watershed • Oregon Watershed Enhancement Board • Oregon Wildlife Heritage Foundation • Pacific Salmon Commission – Southern Fund • Wallawa Whitman & Umatilla National Forests • Freshwater Trust WASHINGTON • Snake River Salmon Recovery Board • Umatilla National Forest

  8. Cost Share / Partners OREGON • Forest Service • Resource Advisory Committee (RAC) • Grande Ronde Model Watershed • Oregon Watershed Enhancement Board • Oregon Wildlife Heritage Foundation • Pacific Salmon Commission – Southern Fund • Wallowa Whitman & Umatilla National Forests • The Freshwater Trust WASHINGTON • Snake River Salmon Recovery Board • Umatilla National Forest

  9. Partner/Cost Share Accomplishments • 546 fish passage structures (inventoried, assessed & prioritized) • 2005-09 Engineering Designs- ($174,338 total) • 2003-2010 Riparian Planting- about 2,500 plants annually ($45,000 annually) • 2008-09 Fence Construction- Aspen, Starvation ($82,000) • Fish Passage- Mahogany (2006) (4 partners: $174,442), Tamarack Culvert (In house removal) • Road Decommissioning (2009)- 7.5 miles ($175,915) • 2003-10 Education/Outreach- 500/year

  10. Current Situation of Project • 2012 Budget took a 60% cut • No Project Leader on staff for this project • Covering with existing staff until…. • BPA to restore budget in 2014 • Still coordinating with Partners • Two cost-share projects on-going • Pataha Creek culvert replacements • Mud Creek OWEB grant proposal • Road decommissioning/culvert replacements

  11. Limiting Factors & Proposed Deliverables • Culvert Replacements • Riparian Restoration • Large Wood Placement projects • Road Decommissioning • Irrigation Diversion Improvement & Sprinkler Installation • Habitat Quantity- Anthropogenic Barriers • Riparian Condition- Riparian Vegetation • Channel Structure and Form- In-stream Structural Complexity • Sediment Condition- Increased Sediment Quantity • Water Quantity – Decreased Water Quantity

  12. Limiting Factors & Proposed Deliverables • Culvert Replacements • Diversions • Riparian Restoration • Riparian Planting • Large Wood Placement projects • Channel Ralignment • Road Decommissioning • Road Improvement • Irrigation Diversion Improvement & Sprinkler Installation • Habitat Quantity- Anthropogenic Barriers • Riparian Condition- Riparian Vegetation • Channel Structure and Form- In-stream Structural Complexity • Sediment Condition- Increased Sediment Quantity • Water Quantity – Decreased Water Quantity

  13. Fish Passage Assessment

  14. Habitat Quantity – Anthropogenic Barriers Mahogany Creek

  15. Habitat Quantity – Anthropogenic Barriers

  16. Riparian Condition – Riparian Vegetation

  17. Sediment Condition – Increased Sediment Quantity

  18. Decreased Water Quantity

  19. Adaptive Management • Adjustments to methods and techniques of implementation based on past experience/ results. • Fish passage • Bottomless culverts or bridges • Road Decommissioning • Clump Plantings work well • Too much straw inhibits revegetation • Fertilizer did not increase rate of regrowth • Management • Partnerships

  20. Data Management • Spatial Database • Microsoft SQL Server and ESRI ArcSDE • Organized by Project Area • Tracks all Restoration Implementation location data (Feature Classes), implementation metrics & Monitoring data (SQL Tables)

  21. Data Outreach • Reports, Summarized Data • Nez Perce Tribe DFRM Website • http://www.nptfisheries.org/DFRMHome.aspx • Spatial Data Viewer and Querying • Watershed Division Mapping Site • http://imsland.nezperce.org/DFRMWatershed/nexviewer_flex.html