Civil engineering for LIU – PS

Civil engineering for LIU – PS. Shielding of route Goward. Status – 22 may 2012. Document « Civil engineering for increasing the radiation shielding on the route Goward . Passage over the PS » completed → EDMS approval procedure ongoing (25 may 2012)

lilika
Télécharger la présentation

Civil engineering for LIU – PS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil engineering forLIU – PS Shielding of route Goward

  2. Status – 22 may 2012 • Document « Civil engineering for increasing the radiation shielding on the route Goward. Passage over the PS » completed → EDMS approvalprocedureongoing (25 may 2012) • CE executiondrawingscompleted → EDMS approvalprocedureongoing (22 may 2012) • Tender documents completed → EDMS approvalprocedurecompleted (16 may 2012) • Marketsurveycompleted → list of firms to befinalized ( translation in english of the tender documents to beconfirmeddepending on the nationality of the selectedfirms) NEXT STEPS • Launch call of tender • Organize an information campaign to the attention of the occupants of the center of the ring NEW ! • Two “sondages” requested by RP to determine if the ground around the PS is contaminated → potential impacts on the method of execution and the cost / delay of work Reminder: the assumption for this project was that there was no RP constraints for materials and/or workers

  3. Installation de chantier

  4. Démolition et démontage

  5. Terrassement et accès provisoire

  6. Pieux

  7. Dalle

  8. Mur bâtiment 365

  9. Mur de soutènement du parking

  10. Mur de soutènement sud-est

  11. Situation finale

  12. Profil en long de la route

  13. Marquage et signalisation

  14. Provisional Schedule Travaux préparatoires avant chantier de génie civil: -Evacuation des transformateurs –EN/EL -Abattage des arbres GS/IS -Dépose des candélabres – GS/SE -Dépose des moniteurs RP - DGS/RP - Autres??