1 / 10

HV & LV status

HV & LV status. DELIVERED AT BLG 904 40/60  67% of the A3009 ( LV ) 6/40  15% A3512N ( HV ) 10/10  100% A3018 ( T sens ) 30/34  88% EASY crates 5/7  71% branch controllers 6 boards land to ALICE + 2 to the DT group. BLG 904 test setup. Hardware and Software Test

lin
Télécharger la présentation

HV & LV status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HV & LV status DELIVERED AT BLG 904 • 40/60  67% of the A3009 (LV) • 6/40  15%A3512N (HV) • 10/10  100%A3018 (T sens) • 30/34  88%EASY crates • 5/7  71%branch controllers • 6 boards land to ALICE + 2 to the DT group P. Paolucci - I.N.F.N. di Napoli

  2. BLG 904 test setup Hardware and Software Test • 3 LV EASY Crate running  15 boards  180 channels • 1 HV EASY Crate running  2 boards  12 channels • 20 LV boards tested = 240 channels  2 broken (< 1%) • 2 HV boards tested = 12 channels  OK • Board Temperature went up to 60 °C due to a bad air circulation. Now fixed and temperature around 40 °C • DCS is always running (see Giovanni Talk) • LabVIEW (D. Lomidze) test program is under installation for more than 900 hours P. Paolucci - I.N.F.N. di Napoli

  3. MAO Rpc-dt MAO rpc-dt LV LV trigger trigger PP PP 24 ch – HV - Barrel 24 ch – HV - Endcap HV HV HV HV HV HV HV HV HV-LV schema for MTCC W+1 LV RPC SY1527 Control cable BC LV BC HV BC LV BC LV HV multicond. 10 ch. service control 380 3-phase W+2 LV RPC LV MAJISTE HV service 48 V - service service 380 3-phase control Balcony Barack Detector

  4. Rack LV 4 pairs LV distrib. board chip chip From LV power supply with floating output ALV1 AGND1 DLV1 ALV DGND1 shielded cable AGND ALV2 AGND2 DLV DLV2 DGND2 DGND shield IRON – MAGNET safety ground AGND FEB 1 chip chip AGND FEB strip copper chip kapton AGND Double Gap 2 Double Gap 1 DGND Chamber metallic structure AGND FEB 6 HVReturn Copper 2 Copper 1 chamber GND RPC ground schema

  5. MAO Rpc-dt MAO rpc-dt trigger LV PP 24 ch – HV - Barrel 24 ch – HV - Endcap HV HV HV HV HV HV HV HV EARTH rack Ground schema for MTCC GND reference on the chamber W+1 LV EASY LV EARTH rack SY1527 GND Iron Control shielded cable BC LV BC HV BC LV BC LV Link Box HV multicond. shielded 10 ch. PP service control 380 3-phase W+2 LV RPC LV MAJISTE HV service 48 V - service service 380 3-phase control Balcony Barack Detector

  6. MTCC status • LV hardware is ready for Barrel and Endcap • HV hardware ready for May the 22th • LV LB hardware now at blg 904 • LV EASY crates installation on the balconies started on May the 9th. • Crate insertion in the rack is difficult • No space around the racks • Balcony barrack 3-phase installation is underway P. Paolucci - I.N.F.N. di Napoli

  7. MTCC status HV multicond. cables • 3 barrel cables are ready and have been tested by myself at CPE • 2 endcap cables are in construction at CPE • They will be sent at CERN on May 12th to be installed on May 22th • Local EASY cables will be ready for May 22th • Service and Control long cables ready on May 22th P. Paolucci - I.N.F.N. di Napoli

  8. To be done • LV hardware is ready for Barrel and Endcap • HV hardware ready for May the 22th • LV EASY crates installation on the balconies started on May the 9th. • Crate insertion in the rack is difficult • No space around the racks • Balcony barrack 3-phase installation is underway We need 1 MAO channel per wheel (RPC-trigger). Ready ?? P. Paolucci - I.N.F.N. di Napoli

  9. RPC DCS for MTCC P. Paolucci - I.N.F.N. di Napoli

  10. To be done for MTCC • Move to RPC condition db on SX5 and test the performance. • Release the CMS_RPCfwHardware Component • Help our Warsaw friends, creating a control and monitoring system of the LB low voltage, and integrate it into the RPC DCS. • Do we want to integrate it in the FSM ?? It will be also discussed tomorrow in the DCS working group. • Test all the system when the hardware will be ready at SX5 (June 06). • Write documentation and organize training in order to have more people ready to take data. P. Paolucci - I.N.F.N. di Napoli