An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alternative Project Delivery Amy Schroeder Idaho Transportation Department Innovative Contracting Manager

  2. Outline • Overview • Project Selection • Design-Build Procurement Process • CMGC Procurement Process

  3. Authority • Design-Build: Idaho Code § 40-904 • CMGC: Idaho Code § 40-905 • 20% limit of annual highway program • ~$60 million annually

  4. Contracting Methods Design-Bid-Build Bid Design Construction Design RFP Construction CM/GC Select Early Procurement Packages Design RFQ RFP Design-Build Construction Select

  5. Relationships with Department Owner Owner Owner Designer Contractor CM/GC Design-Build Firm Designer

  6. Project Nomination Criteria • Complexity / Innovation • Delivery Schedule • Level of Design • Risk Factors • Agency Factors • Market Factors • Third Party Coordination

  7. Risk Assessment and Allocation

  8. Procurement Requirements • Design-Build: two phase procurement process • RFQ for qualifications-based (short-list) • RFP for technical and price proposals • CMGC: single phase procurement process • RFP for qualifications-based and technical/price proposal

  9. Stipend (DB only) • Based upon the estimated project costs • Can be increased for complexity if needed TABLE • Non-responsive proposals are not eligible • If accepted, Department owns the work products

  10. Design-Build Methods • Best Value:Price proposal divided by the technical proposal score, awarded to the lowest overall score • Fixed Price, Best Design:Highest technical proposal score • Lowest Price, Technically Acceptable: Lowest price proposal that meets minimum technical and designer qualifications requirements • Generally, innovation or alternatives are required • No right-of-way, utility or railroad permits obtained by the design-build firm • Department obtains the required environmental clearances • Preliminary design is completed and the design-build firm’s role is limited to completing the design and constructing the project

  11. RFQ Information • Project goals • Project scope • Estimated cost • Design and construction or fixed price • Maximum time allowed for project • Design and construction • Description of the evaluation criteria and process • Requirements for key personnel

  12. RFQ Evaluation Criteria • Construction-related experience and performance • Specialized experience and technical competence • Key personnel • Designer experience and qualifications • Performance on similar projects • Qualifications and relevant experience • Financial, personnel and equipment resources • Proposed plan to manage design and construction • Understanding of and approach to the project • Other appropriate qualifications-based selection factors

  13. Designer Qualifications • Project complexity • Project’s level of design completeness prior to the RFP • Potential for design innovation and alternatives • Project impacts to the public during construction and operation

  14. RFP Information • Project goals & scope • Estimated cost • Maximum time allowed for project • Base concept • Performance and technical requirements (specifications) • Required deliverables • Description of the selection and award criteria • Copies of the contract documents • Critical path method

  15. RFP Evaluation Criteria • Project-specific technical and quality factors • Design and construction qualifications • Innovation* • Design and construction quality* • Time of completion* • Price *optional or integrated into other criteria

  16. RFP Contract Provisions • Payment/performance bond, proposal guaranty, insurance • Standards, rules, guidelines, and special provisions • Design and construction requirements, including specifications and environmental regulatory requirements • Final documents upon completion of the project • Submittal date for technical and price proposals • Date for opening the sealed price proposals

  17. Alternative Technical Concepts • Encourage innovation and tailor delivery and project to proposer’s means and methods • Equal to or better than the base concept • Improve project quality and/or reduce project costs • A proposed ATC is not acceptable if it merely seeks to reduce quantities, performance or reliability, or seeks a relaxation of the contract requirements

  18. Alternative Technical Concepts • Preapproved to include in technical and price proposal • Each proposer shall submit only one proposal • Price proposal shall reflect any incorporated ATCs • The proposal may not otherwise contain exceptions to or deviations from the requirements of the RFP • Proposals with ATCs are evaluated against the same technical criteria as those without • Preapproved ATCs incorporated in a proposal become part of the contract upon award

  19. DB Proposals • Technical and price proposal submitted concurrently • Evaluation committee evaluates the technical proposals based upon established criteria • Time-adjusted price (value of the time factor) • Total time value = total number of days to complete the project * time factor • Time-adjusted price is the total time value plus the total price proposal amount • Each proposer gets a summary of scores of all proposers and their own evaluation worksheets

  20. CM/GC Process • Competitive procurement process • Qualifications component • Price component • Both qualifications and price are rated on a point-scale • Highest ranking firm gets contract • Two part contract • Design services & assistance • Construction GMP

  21. 2-Phase Contract • Design services • Life-cycle cost considerations • Scheduling • Cost estimating • Constructability • Alternative construction options for cost savings • Sequencing of work • Construction services • Awarded after the plans have been sufficiently developed • Guaranteed maximum price (GMP)

  22. RFP Information • Description of project • Including programmatic, performance, technical requirements and specifications • Description of the qualifications to be required of the firm • Description of the requirements of key personnel • Description of the process the department will use to evaluate proposals • Schedule of unit prices requiring pricing • Approach to pricing • The form of the contract to be awarded

  23. RFP Evaluation Criteria • Ability and qualifications of key personnel • Financial, labor and equipment resources and availability • Ability to meet time and budget requirements • Scope of work to be self-performed and ability to perform that work • Approach to working collaboratively with the department • Construction experience in similar projects • Unit prices and approach to pricing

  24. CMGC Proposals • Technical and price proposal submitted concurrently • Evaluation committee evaluates the technical proposals based upon established criteria • Price proposal score combined with technical score • Highest overall score is successful proposer • Each proposer gets a summary of scores of all proposers and their own evaluation worksheets

  25. Department’s Progress • Outreach: Districts, AGC, others • DB pilot project awarded September 2012 • Next steps • Project nominations by districts and bridge section • Approval by Transportation Board and FHWA

  26. Additional Information • ITD Innovative Contracting Unit Website and Advertisement Announcements: ITD.Idaho.Gov Doing Business With ITD Alternative Contract Procurement Services Sharepoint (internal to ITD): Division: Highways, ICU • Amy Schroeder, Innovative Contracting Manager Amy.Schroeder@itd.idaho.gov (208) 334-8772