Alternative COA Water Delivery

Alternative COA Water Delivery. Concept of Operations. Utilize one MPF ship to produce and deliver sea-based potable water from ship to shore via containers to undeveloped beach and port locations locations with personnel already in theater. Advantages.

Télécharger la présentation

Alternative COA Water Delivery

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alternative COAWater Delivery

  2. Concept of Operations • Utilize one MPF ship to produce and deliver sea-based potable water from ship to shore via containers to undeveloped beach and port locations locations with personnel already in theater.

  3. Advantages • MPF Ship not limited to an established port as we now can deliver water to wherever it is needed. • MPF Ship can offload water to multiple beaches per day. • Water offloaded via lighterage in portable containers (up to 2000 liters) utilizing forklift. • 1000L container are ideal • Containers can be replenished when ship returns to that location.

  4. Specifications • Each MPF ship is capable of storing approx 304K L (80K gals) of potable water • Each ship is capable of making 76K liters (20K gals) of water per day • Powered barge (CSP and CIN) can transport 1 forklift in addition to 68K L (18.5K gals) in containers or 117K L (31K gals) without forklift • One LCM8 can deliver 30K L per trip • In summary we can put 147 containers (1000L) of potable water on the beach in a single trip

  5. Manning Requirements Can complete mission with personnel already on the ground • Cargo Handlers/Crane Operators (NCHB-1) • 16 personnel in country • Barge ferry operators (ACB-1) • 29 personnel in country • LCM-8 operators (ACU-1) • 8 personnel in country • Beach Masters (BMU-1) • 17 personnel in theater (5 in country, 12 in theater)

  6. Concerns • The MV PLESS is the preferred ship as it allows the quickest offload/backload of lighter with personnel currently in theater. • However, requires permission to open hatches if additional equipment is required • Survey (SLRP) of each location is desired • Availability of 500 gallon containers. • Prices per container from 1 source vendor: • 700 L (165gal) US$76 each • 1000 L (264 gal) US$92 each • 1850 L (437 gal) US$142 each • 2000L (528gal) US$165 each