1 / 3

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Technical Guidance Document Input for Advanced Metering Interface Date Submitted: 10 Jul 2014 Source: Dalton Victor Company: Silver Spring Networks

lonna
Télécharger la présentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Victor (Silver Spring Networks) Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:Technical Guidance Document Input for Advanced Metering Interface Date Submitted: 10 Jul 2014 Source:Dalton Victor Company: Silver Spring Networks Address: 555 Broadway Street, Redwood City, CA 94063 Voice: +1 650 839 4604, E-Mail: dvictor@silverspringnet.com Re:Technical Guidance Document Abstract:This presentation helps to facilitate a discussion on various parameters related to ranging to facilitate AMI applications Purpose:Progress TGD Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

  2. Victor (Silver Spring Networks) Assumptions for AMI Application Ranging requirements • Assumptions for AMI Applications: • Endpoints do not move relative to Earth after installation. • Ranging information is not needed immediately after installation • Sub-1 meter range resolution not needed

  3. Victor (Silver Spring Networks) Ranging Parameters • Audience Input encouraged! • Range accuracy Requirement: ≤ 3 meters • Range Resolution Requirement: ≤ 1 meter • Maximum Range support: ≥ 1 kilometer • Latency before first ranging functionality available after installation: ≤ 1 hour • Latency in reporting range to a specific partner node: ≤ 1 minute

More Related