1 / 3

TDR: First draft on google docs A.- DOM ELECTRONICS 1.- Photomultiplier base

TDR: First draft on google docs A.- DOM ELECTRONICS 1.- Photomultiplier base 1.1. PMT BASES Specifications 2.- The OCTOPUS BOARD 3.- POWER BOARD 3.1 POWER UP SEQUENCE 4.- CENTRAL LOGIC BOARD 4.1.- TIME TO DIGITAL CONVERTERS 4.1.1.- OVERSAMPLING TECHNIQUE 4.1.2.- IMPLEMENTATION

lot
Télécharger la présentation

TDR: First draft on google docs A.- DOM ELECTRONICS 1.- Photomultiplier base

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDR: Firstdraftongoogledocs A.- DOM ELECTRONICS 1.- Photomultiplier base 1.1.PMT BASES Specifications 2.- The OCTOPUS BOARD 3.- POWER BOARD 3.1 POWER UP SEQUENCE 4.- CENTRAL LOGIC BOARD 4.1.- TIME TO DIGITAL CONVERTERS 4.1.1.- OVERSAMPLING TECHNIQUE 4.1.2.- IMPLEMENTATION 4.2.- WR COMMUNICATIONS 4.3.- INSTRUMENTATION 4.4.- SOFTWARE 5.- POWER BUDGET B.- ON-SHORE STATION

  2. PRR: Created in googledocs a folder structure. Startto prepare thedocumentation Leiden collaborationmeeting: TalksfortheElectronicssession (Similar tothelastcollaborationmeeting) CLB Tender: MASER and TBP havenotreceivedyetthedocumentation. PHOENYX?

  3. Labelingproposal: CLB 3.4.3.2/V2.2/1 -> MASER 3.4.3.2/V2.2/2 -> PHOENYX PB 3.4.3.5/V2.2/1 -> MASER 3.4.3.5/V2.2/2 -> PHOENYX 3.4.3.5/V2.2/3 -> GREECE Octopus 3.4.3.1.1/V4/1 -> NEW WAYS 3.4.3.1.2/V4/1 -> NEW WAYS

More Related