lucien
Uploaded by
4 SLIDES
183 VUES
40LIKES

Pressure Sensor System Development: Components, Circuit Design, and Programming Overview

DESCRIPTION

This project focuses on the development of a pressure sensor system, covering the identification and ordering of key components such as pressure sensors, microcontrollers, LED displays, and operational amplifiers. The estimated timeline for component procurement is 1 week, with costs calculated for each component. Circuit design encompasses creating and integrating circuits for pressure sensors, microcontrollers, and displays into a cohesive network, followed by testing and refinement, estimated at 3 weeks per stage. Finally, programming the microcontroller and individual components is projected to take 4 weeks.

1 / 4

Télécharger la présentation

Pressure Sensor System Development: Components, Circuit Design, and Programming Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Work Breakdown Schedule

  2. Components • Research and find all components • Pressure Sensor • Micro controller • LED Display • Operational Amplifier • Order components • Est. time: 1 week • Est. Cost • Op Amp: $ 4 each • Micro Controller: $6 • LED Display: $1.50 • Pressure Sensor: $2 each

  3. Circuit Design • Design circuits for different parts of the network • Create circuit for pressure sensors • Create circuit for LED Display • Create circuit for Micro Controller • Implement circuits into overall network • Test and refine at each stage • Est. time for each stage: 3 weeks

  4. Programming • Create program for the Micro Controller • Test with individual parts of the project • Est. time: 4 weeks

More Related