1 / 6

NEPTUNE POWER SYSTEM DESIGN

NEPTUNE POWER SYSTEM DESIGN. Total NSF Expenditures. AMOUNT SPENT $231,600 (12%). TIME EXPENDED 29%. NEPTUNE POWER SYSTEM DESIGN. APL NSF Expenditures. FABRICATION. NON - FABRICATION. AMOUNT SPENT $105,470 (40%). AMOUNT SPENT $69,545 (21%). NEPTUNE POWER SYSTEM DESIGN.

luke-rivera
Télécharger la présentation

NEPTUNE POWER SYSTEM DESIGN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEPTUNE POWER SYSTEM DESIGN Total NSF Expenditures AMOUNT SPENT $231,600 (12%) TIME EXPENDED 29%

  2. NEPTUNE POWER SYSTEM DESIGN APLNSF Expenditures FABRICATION NON-FABRICATION AMOUNT SPENT $105,470 (40%) AMOUNT SPENT $69,545 (21%)

  3. NEPTUNE POWER SYSTEM DESIGN EE: EL-SHARKAWI FABRICATION NON-FABRICATION AMOUNT SPENT $12,483 (10%) AMOUNT SPENT $29,436 (20%)

  4. NEPTUNE POWER SYSTEM DESIGN EE: LIU FABRICATION NON-FABRICATION AMOUNT SPENT $3,800 (4%) AMOUNT SPENT $10,863 (11%)

  5. NEPTUNE POWER SYSTEM DESIGN JPL & OCEANOGRAPHY JPL OCEANOGRAPHY AMOUNT SPENT $0 (0%) AMOUNT SPENT $3 (0%)

  6. NEPTUNE POWER SYSTEM DESIGN FINANCIAL SUMMARY

More Related