1 / 5

THEMIS MISSION PRE-ENVIRONMENTAL REVIEW PCA EGSE David Curtis University of California - Berkeley

THEMIS MISSION PRE-ENVIRONMENTAL REVIEW PCA EGSE David Curtis University of California - Berkeley. PCA EGSE. The PCA EGSE interfaces to the THEMIS probes when they are on the Probe Carrier JPL, ASO, Launch Pad (Blockhouse)

lynde
Télécharger la présentation

THEMIS MISSION PRE-ENVIRONMENTAL REVIEW PCA EGSE David Curtis University of California - Berkeley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS • MISSION PRE-ENVIRONMENTAL REVIEW • PCA EGSE • David Curtis • University of California - Berkeley

  2. PCA EGSE • The PCA EGSE interfaces to the THEMIS probes when they are on the Probe Carrier • JPL, ASO, Launch Pad (Blockhouse) • Harnessing connects the PCA EGSE to individual probes, the PCA, or the blockhouse connectors • The PCA EGSE uses an existing Umbilical Rack to provide power (battery charging) and monitor the probe discretes (one probe at a time) • PCA EGSE Includes Battery over-charge protection • The PCA EGSE includes a PTP and ITOS workstation to provide command and telemetry interface to a selected probe • The PCA EGSE can be run remotely from the MOC • Important for launch day

  3. PCA EGSE Probe A Probe B Probe C Probe D Probe E PCA Launch Tower Harness (or Launch Tower Sim Harness) Blockhouse Interface Blockhouse Harness PCA EGSE Umbilical EGSE remote monitors PTP TCP/IP to MOC ITOS

  4. PCA EGSE

  5. PCA EGSE STATUS • PCA EGSE is built and tested • Software is complete • except for software backup of battery over-charging protection • Has been tested with probes at UCB • Will be tested with PCA at JPL prior to installation of probes • Safe to mate • First end to end test including blockhouse harness