1 / 31

How does ISAT331 fit in the curriculum?

How does ISAT331 fit in the curriculum?. ISAT 331 Automation in Manufacturing. 211,330. 211, 330. ISAT 211 & 330. Factory Operations 211. 211, 330. 211, 330. 331. 331. ISAT 331. 331. 331. References.

macy-holden
Télécharger la présentation

How does ISAT331 fit in the curriculum?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How does ISAT331 fit in the curriculum? ISAT 331 Automation in Manufacturing

  2. 211,330 211, 330 ISAT 211 & 330 Factory Operations 211 211, 330 211, 330

  3. 331 331 ISAT 331 331 331

  4. References • Groover, M.P, Automation, Production Systems, and Computer Integrated Manufacturing, Prentice-Hall 2001 • Bedworth, D.D.,Henderson, M.R., and Wolfe P.M., Computer-Integrated Design and Manufacturing, McGraw-Hill, 1991. • Chang,T., Wysk,R..A, Wang, H. Computer Aided Manufacturing, Prentice Hall, 2nd Ed, 1991

  5. Module 1 Introduction 1/10/05 • Production Systems Facilities • Automation in Production Systems • Manual Labor in Production Systems • Automation Principles and Strategies • CAD, CAM and CIM

  6. ISAT330 Production System Terminologies Manufacturing Support Activities ISAT331 Computerization Manufacturing System CIM Automation

  7. Computers in Manufacturing • Automate physical system and information system in manufacturing • Automation is more related to automating the factory operations • Computerization is more related to automating information cycle • CIM is more related to automating of both factory operations and information cycle

  8. Hard MH automated Changeover (set up)Time Product Variety Soft 100 10,000 1 M Low High Production Quantity Product Variety vs Production Quantity Job Shop Mid Variety Mid Production (Most Difficult) Mass Production

  9. Fig 1.3

  10. Hard Product Variety Soft 100 10,000 1 M Low High Production Quantity Types of Production Plant (facilities) and Layout • Fixed Position (Large) • Process Job Shop • Process (Batch) • Cellular (GT families) • FMS (GT families- automated MH) Mid Variety Mid Production (Apply GT) Flexibility • Product (Flow line) • Process (Quantity) Efficiency Mass Production

  11. Characteristics of Production Plants • Job Shop has processes that cope with low volume and high number of products • - Uses Process or Fixed position layout • - Make to order. - Production Rate = Demand Rate • Batch, cellular, and FMS Production has processes that cope with medium volume and medium variety in products • Cellular deals with harder variety products than FMS • FMS is highly automated (MH) when compared to cellular • - Repeated set up-a major disadvantage. • - Production rate > Demand rate. • - Make to Stock.

  12. Characteristics of Production Plants • Mass Production has processes that cope with high volume and limited number of products • - Process or cellular layout is used for quantity production (single station ‘equipment’) • - Product layout ’Flow Line’ when multiple stations are required (single- or mixed model lines) • - Demand Rate ~ Production Rate

  13. Automation of Production Plant • Definition of Automation • Why to Automate? • Arguments for Automation • Arguments against Automation • Examples • Types of Automated Manufacturing Systems • Categorized based on sequence of operations • Justified based on production volume and variety of products • Fixed Automation • Programmable Automation • Flexible Automation

  14. Hard Product Variety Soft 100 10,000 1 M Low High Production Quantity Manual vs Automation

  15. Hard Product Variety Automation Manual Soft 100 10,000 1 M Low High Production Quantity Fig 1.1 Automation/Production Volume/Product Variety Programmable Automation Job Shop Flexible Automation Change Over (Set-up) Time Mid Variety Mid Production (Most Difficult) Fixed Automation Mass Production

  16. Programmable Automation • MOST FLEXIBLE • Sequence of operations can be changed (variety of products that are made by similar processes) • High investment (general purpose equipment) • Low – Medium production rate (relatively longer time lost for changeoversofprogramming and set-up) • Automation of operations (processes or workstations) • is emphasized (not MH)

  17. Fixed Automation • MOST EFFICIENT • Sequence of operation is fixed (fixed configurations) • Many simple ( reliability) operations (complex system) • Initial investment is high (custom-engineered equipment) • Production rates are high (mass production-Examples) • Automated Operations (processes or workstations) • and Material handling

  18. Flexible Automation • Extension of Programmable Automation with • Lower time lost on changeovers (continuous production of a group of parts – GT family- that accommodate part variations within the family) • Mid volume/variety range • Higher investment (custom-engineered devices (e.g fixtures and Jigs) for changeover)

  19. Automation Strategies & Migration • Automation is not the answer (Robotics application?) • Main principle Understand (charting?), Simplify, and Automate • Strategies? • Automation Migration Strategy

  20. Fig 1.9

  21. Manufacturing Support Activities Back to our Conceptual Model Manufacturing System

  22. Factory Operations • (Fig 2.2) • Processing ‘advance to completion’ (Basic, Secondary, Property Enhancement, Finishing) • Assembly • Material handling&Storage • Inspection (specifications)and Testing (function) • Control on shop floor (process control, quality control)

  23. SAP system?

  24. Manufacturing Support Activities • (Fig 2.4) • Business functions (type of orders?) • Product Design (source of specifications?) • Manufacturing Planning (process planning and route sheet?) • Manufacturing Control (management) ‘implement plans’(type of controls?), performance of processes “ # rejects, machine rate, etc”, performance of plant “operating cost, meeting schedule”, etc)

  25. Manual Labor in Production System • Factory Operations • Supporting Activities

  26. Fig 24.7 Scope of CAD, CAM and CIM

  27. Fig 24.8

  28. Definitions • CAD is any design activity that involves the effective use of computer technology to create,modify, or document an engineering design (part or system) • CAM is the effective use of computer technology in the planning, management, and control of the manufacturing function • CAD/CAM integration of the design and manufacturing activities. That is to automate the transition from design to manufacturing (e.g NC and process plan and Rapid Prototyping)

  29. Home Work#1 Due Wednesday 1/18/2006 • Explain and contrast the characteristics of the basic production systems • Explain and contrast the characteristics of the basic automated production systems • Discuss TWO situations in which humans are preferred over automation in Factory Operations (blue collar tasks) • Discuss TWO situations in which humans are preferred over automation in Manufacturing Support Systems (white collar tasks) • Explain THREE strategies for automating production systems

  30. Unused Slides

More Related