Submarine Evacuation System for Offshore Structures

Submarine Evacuation System for Offshore Structures. Client: Dr. Michael Hinchey. Agenda. Problem Statement Project Overview Deployment Strategies Prototype Design Manufacturing Commissioning Conclusion Future Work & Recommendations Questions. Problem Statement.

mada
Télécharger la présentation

Submarine Evacuation System for Offshore Structures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Submarine Evacuation System for Offshore Structures Client: Dr. Michael Hinchey

  2. Agenda • Problem Statement • Project Overview • Deployment Strategies • Prototype Design • Manufacturing • Commissioning • Conclusion • Future Work & Recommendations • Questions

  3. Problem Statement • Develop a prototype and deployment strategies to prove an autonomous submersible could be used as an evacuation method for offshore structures.

  4. Project Overview • Current Problem • Lifeboats – Exposed to Hazards • Freefall – Uncontrolled • Proposed Solution • Deployable Submarine • Project Goals • Develop and Test Automated Submarine Prototype • Develop and Test Deployment Options • Identify Design Requirements

  5. Control Sequence + Φ - Φ + θ - θ Z1 + Z Z2

  6. Deployment Strategies 1. Vertical Deployment • Propeller-down launch • Underwater • Avoid GBS interference 2. Horizontal Launch • Release bay filled with water • Exit from enclosed piping 3. Horizontal Docking • Connect with GBS 2. 1. 3.

  7. Prototype Design Evolution Phase 1 • Phase 3 • Propeller Shroud with Streamline Hub • Piston Ballast Pumps • Internal Support Mounts • Stepper Motor Sleds Phase 2 Phase 3

  8. Prototype Design • Ring guide and shroud • Protect hull • Allow air and water passage around sub during deployment • Shroud • Protects thruster from being damaged • Streamlined hub reduces eddy currents • Lifting Hook allows for the lifting of prototype • Center-axis mounted thruster with F/R control • Piston Pumps

  9. Prototype Design: Internal Mounting • 2 Ballast Pump Mounts • 2 Ballast Pumps • 2 Support Rings • 3 Batteries • 1 Circuit Board • 2 Stepper Motors • 4 ¼”-20 Threaded Rod Prototype SolidWorks Model ¼ "-20 Hex Nuts ¼" -20 Threaded Rod

  10. Prototype Manufacturing • Ballast Chamber • 25mm diameter piston pump • 40mm vertical piston travel • Driven by stepper motor via rack in pinion

  11. Prototype Design: Ballast System Internal Piston Setup Rod Support Mounts Piston Ballast Pump Rack & Pinion (32 - 3/16”) Stepper Motor & Sled

  12. Pseudo-wiring Diagram Circuit * GND RS-232 DE-9 Female Pinout MOSFETS Signals 1-6 Pressure Sensor, Accelerometer, etc. ** +5 V PIC * ** GND Signals 1-6 VIN Stepper Motor Stepper Motor Piston Batteries Thruster Clamp

  13. Prototype Manufacturing • Hull • Extruded ABS Pipe provided by EMCO • Completed by Tech Services • Ring Guide/Shroud • RP ABS Plastic • Completed by MTC • Piston Pumps • Fabricated from recycled piston shocks • Completed by Tech Services

  14. Commissioning • Water Control Tests • Water Tight Hull • Pre-ballast and leveling • Dry Control Tests • Stepper Motor Test • Thruster Test • Sensor Test • Dynamic Balancing

  15. Conclusion • Developed an automated submersible prototype with active Pitch, Depth, and Thrust control • Developed commissioning procedures to verify operability of prototype • Developed test procedures to simulate emergency evacuation of offshore structures • Developed the codes required to perform testing with the prototype

  16. Recommendations and Future Work • Complete commissioning of active systems • Depth • Pitch • Thrust • Complete deployment tests • Analyze motion • Make recommendations for viability of full-scale implementation

  17. Questions? Thank-you www.lifesubengineering.weebly.com