Submarine Evacuation System for Offshore Structures

Submarine Evacuation System for Offshore Structures. Group Members: Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan. Client: Dr. Michael Hinchey. Agenda. Project Overview Problem Statement Strategy Current Progress Upcoming Milestones

milica
Télécharger la présentation

Submarine Evacuation System for Offshore Structures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Submarine Evacuation System for Offshore Structures Group Members: Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan Client: Dr. Michael Hinchey

  2. Agenda • Project Overview • Problem Statement • Strategy • Current Progress • Upcoming Milestones • Presentation 2 Deliverables • Questions

  3. Project Overview • Previous Incidents • Current Solutions • Outstanding Risks • Fire • Ice • Waves • Wind

  4. Problem Statement • To provide a solution for evacuation of an offshore structure through the development of a fully-submersible vessel deployable from the topsides of an offshore structure

  5. Strategy • Phase 1 • Prototype Development • Deployment Strategies • Phase 2 • Submarine Fabrication • Prototype Commissioning • Deployment Testing • Phase 3 • Option A: Preliminary Full-scale Design • Option B: Revisit Prototype Design

  6. Current Progress – Phase 1 • Design of the prototype model • Structural Design • Mechanical Design • Electrical Design • Motion analysis – In Progress Circuit Board Thruster Stepper Motor Ballast Tank Battery

  7. Deployment Strategies

  8. Upcoming Development- Phase 2 01. Submarine Fabrication • Dave Snook – Tech Services • Andrew Bazeley – Tecnadyne • Paul Sirois – Clark Solutions • Brian Pretty – Manufacturing Technology Centre 02. Prototype Verification • Michael Hinchey – Client 03. Deployment Method Testing • Leonard Lye – DOE Specialist

  9. Presentation 2 Deliverables • Test analysis completed • Phase 3 Project Direction Finalized

  10. Questions? Thank-you www.lifesubengineering.weebly.com