Woodbridge SchoolDistrictDesign Development forWoodbridge High School 22 May 2012
Site Plan Concept A
Design Development DD Plan • Ground Floor
Design Development DD Plan • Second Floor
Design Development The following series of images are intended to indicate the level of detail associated with current Design Development plans. We have only presented a small portion of the design sheets.
Design Development The project is being designed using Building Information Modeling – BIM • Considered “next generation” of Auto-Cad • 3D virtual building – allows “clash detection” of trades on paper prior to construction • Clash detection resolution prior to construction reduces potential for change-orders
Design Development The following series of images show some of the detail associated with BIM – virtual 3D designs becomes
Woodbridge School DistrictProject Cost Summary – up-dated Building Construction Costs $ 46,597,632 Design & Consulting Fees $ 2,659,269 State, County, Local & Agency Fees $ 1,155,895 FF&E & Technology Equipment $ 1,970,000 Subtotal $ 52,382,795 Total Project Costs $ 52,382,795 Woodbridge School District Budget $ 52,539,700 Total Amount Under / (Over) Budget $ 156,905 Proposed Add Alternates $ 3,000,000 May 22, 2012
Woodbridge School DistrictProject Schedule Space programming 09/22/11 – 11/16/11 Schematic Designs (30%) 11/11/11 – 01/17/12 Design Development (60%) 12/19/11 – 04/23/12 Construction Documents 03/22/12 – 08/23/12 Bid Pack A (Site Concrete & Steel) 8/20/12 Bid Pack B (Building & Systems) 10/03/12 Funding available $10.5 m 10/2011 (FY-12) Funding available $21.0 m 10/2012 (FY-13) Funding available $21.0 m 10/2013 (FY-14) 3/29/12 On sched. On Schedule On Schedule 12/11
Questions and Answers Recommend the Woodbridge Board of Education approve for continued design progression, the design development documents, budget and schedule Thank you!