An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Woodbridge SchoolDistrictDesign Development forWoodbridge High School 22 May 2012

  2. Site Plan Concept A

  3. Design Development DD Plan • Ground Floor

  4. Design Development DD Plan • Second Floor

  5. Design Development The following series of images are intended to indicate the level of detail associated with current Design Development plans. We have only presented a small portion of the design sheets.

  6. Design Development

  7. Design Development

  8. Design Development

  9. Design Development

  10. Design Development

  11. Design Development

  12. Design Development

  13. Design Development

  14. Design Development The project is being designed using Building Information Modeling – BIM • Considered “next generation” of Auto-Cad • 3D virtual building – allows “clash detection” of trades on paper prior to construction • Clash detection resolution prior to construction reduces potential for change-orders

  15. Design Development The following series of images show some of the detail associated with BIM – virtual 3D designs becomes

  16. Design Development

  17. Design Development

  18. Design Development

  19. Woodbridge School DistrictProject Cost Summary – up-dated Building Construction Costs $ 46,597,632 Design & Consulting Fees $ 2,659,269 State, County, Local & Agency Fees $ 1,155,895 FF&E & Technology Equipment $ 1,970,000 Subtotal $ 52,382,795 Total Project Costs $ 52,382,795 Woodbridge School District Budget $ 52,539,700 Total Amount Under / (Over) Budget $ 156,905 Proposed Add Alternates $ 3,000,000 May 22, 2012

  20. Woodbridge School DistrictProject Schedule   Space programming 09/22/11 – 11/16/11 Schematic Designs (30%) 11/11/11 – 01/17/12 Design Development (60%) 12/19/11 – 04/23/12 Construction Documents 03/22/12 – 08/23/12 Bid Pack A (Site Concrete & Steel) 8/20/12 Bid Pack B (Building & Systems) 10/03/12 Funding available $10.5 m 10/2011 (FY-12) Funding available $21.0 m 10/2012 (FY-13) Funding available $21.0 m 10/2013 (FY-14) 3/29/12 On sched. On Schedule On Schedule 12/11

  21. Questions and Answers Recommend the Woodbridge Board of Education approve for continued design progression, the design development documents, budget and schedule Thank you!