An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The European CCS Demonstration Project Network Lessons on public engagement Eelco Kruizinga Project Manager eelco,kruizinga@dnv.com

  2. Our Network • Members have concrete plans to demonstrate operation of the full CCS value chain: • by end of 2015 • on a minimum power plant capacity of 250 MW, or equivalent industrial output (500 kt avoided CO2 emissions per year) • with at least 85% capture rate of the treated flue gas stream Supporting first movers 26 May2011

  3. Membership

  4. Reports 26 May2011

  5. Public engagement 2010: methodologies • National Energy Technology Laboratory (NETL) best practice guide for Public Outreach and Education for Carbon Storage Projects (Dec 2009) • Integrate Public Outreach into Project management • Establish a strong outreach team • Identify key stakeholders • Conduct and apply social characterisation • Develop an outreach strategy and communication plan • Develop key messages • Develop outreach material tailored to audience • Actively oversee the outreach throughout the life of the CO2 storage project • Monitor the performance of the programme and changes in public perceptions and concerns • Be flexible, refine the outreach 26 May2011

  6. Public engagement 2011: issues

  7. Journey

  8. Thank you for your attention eelco,kruizinga@dnv.com