T2 Reinstatement Schedule and Next Steps Update - November 2009

This document outlines the current status and next steps for the T2 reinstatement project as of November 16, 2009. Key points include anticipated delivery of non-DLC bearings, with Torlon expected this week and Vespel by December 12. Ongoing work includes assessing forces from misaligned coils via the OPERA model and developing a magnetic QA rig. Progress on T3 machining is positive, with coil preparation in Sheffield. The upcoming meeting on December 2 will address winding coil precision, and T3 schedules remain on track.

mahlah
Télécharger la présentation

T2 Reinstatement Schedule and Next Steps Update - November 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. K. Long, 16Nov2009 Target:

  2. Schedule for T2 re-instatement: • T2#2: • Next steps: • Non-DLC bearings: • Delay in material delivery: • Torlon delivery expected this week • Vespel (preferred material) expected 12 December • In parallel: • Checking forces generated with mis-aligned coils using OPERA model (PS, TB): ongoing • Devising magnetic QA rig (GB + Shf): ongoing • Devising concept for winding coils that is more precise • Will be discussed at Trgt w/s 02Dec09 in Sheffield • Schedule T3: • Machining of parts progressing well • Coils for T3 prepared in Sheffield: • Will consider whether to use new coils or present coils based on:magnetic analysis; Magnetic QA on T2 stator

  3. T3 schedule: • T3 schedule still looks OK: • Need to expedite ‘R&D’ work on T2#3 • Which is in hand