This document outlines the detailed cost analysis for setting up a fashion hall, including installation and operational expenses for an event. It covers site preparation, team member engagement—including designers, contractors, movers, and decoration teams—along with direct labor and materials costs. Specific expenses such as catering, furniture rental, and prizes for winners are also included. The analysis provides a structured approach to managing costs and ensuring the success of the event, highlighting both fixed and variable expenses for clear budgeting.

mahsa
Télécharger la présentation

Comprehensive Cost Analysis for Fashion Hall Installation and Event Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Setting up the Fashion hall. Cost analysis Installation of the fashion hall Operation Event

  2. Installation Of the fashion hall 2. Prepare site. 2.1 Identify team members 2.1.1 Engage Designer. Direct labour S$300 (variable) Contingency cost  S$30 2.1.2 Engage Contractor. Direct labour S$500 (variable) Contingency cost  S$50 2.1.3 Engage Movers Direct labour S$1500 (fixed) 2.1.4 Decoration Community Direct labour S$200 (fixed) 2.1.5 Catering Services Direct Expenses  S$ 750 (fixed)

  3. Installation Of the fashion hall(cont) 2.3 Prepare a material checklist for furniture to be rent and decorations. • Renting of furniture Direct Materials  S$ 3000 (variable) contigency cost  S$300 2.4 Prepare prize to be given off to winners Direct Materials  S$200 (fixed)

  4. Installation Of the fashion hall(cont) 3. Clear Site 3.3 Engage sub-contractor to remove stage. Direct labour S$5000 (variable) contingency  S$ 500 3.4 Engage cleaners Direct labour  S$1000 (fixed) 3.5 Helpers pay Direct labour  S$100/day/person (variable) Contingency  S$500

  5. Operation Event • Manpower 1.1 Security Guards Direct labour S$150/pax (fixed) 1.2 AVA crews Direct labour  S$200/pax(fixed) 1.3 Judges Direct labour  S$750 (fixed)

  6. Operation Event (cont) 1.4 Receptionist Direct labour  180/pax (fixed) 1.5 Emcees Direct labour  200/pax (fixed) 1.6 Cleaner Direct labour  120/pax (fixed) 1.7 Ushers Direct labour  150/pax (fixed)