Nodal Advisory Task Force

Nodal Advisory Task Force. Update for TAC November 4 th , 2010. TAC Update from Nodal ATF. Met October 5 th , 26 th , and November 2 nd . DAM Deep Dive Each Thursday @ 10am Next few meetings scheduled for: Tuesday, November 9 th , 2010 - AS Capacity Expectations

maili
Télécharger la présentation

Nodal Advisory Task Force

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nodal Advisory Task Force Update for TAC November 4th, 2010 http://www.ercot.com/committees/board/tac/natf/ 1

  2. TAC Update from Nodal ATF Met October 5th, 26th, and November 2nd. DAM Deep Dive Each Thursday @ 10am Next few meetings scheduled for: Tuesday, November 9th, 2010 - AS Capacity Expectations Tuesday, November 16th, 2010 tentative Tuesday, November 30th, 2010 ? December ? Meetings http://www.ercot.com/committees/board/tac/natf/ 2

  3. TAC Update from Nodal ATF 9/7 motion NATF Motions . . . • Motion to endorse ERCOT’s proposal to withdraw NPRR287 and to allow any Market Participant, subject to protocol requirements, to receive available Real-Time Prices via ICCP. • The motion carried with one abstention from the Independent Retail Electric Provider (IREP) Segment.

  4. TAC Update from Nodal ATF 9/7 motion NATF Motions . . . • Motion to recommend Option 4 to TAC; ERCOT Calculate the Proxy Heat Rate (PHR), the Value X, and Emissions costs, for the 12/1/10 Operating Day using normal production procedures and timelines, and using zonal Real-Time Hub prices as necessary.  • Motion carried by roll call vote with one abstention from the Consumer Market Segment.  • Voting ballot attached to Notice. 

  5. TAC Update from Nodal ATF 9/7 motion NATF Motions . . . • Motion to endorse ERCOT comments to NPRR 277 to be considered by TAC with the initial value of REGP no less than 0.75 in conjunction with considering periods when any Resource is asked to move beyond its ramp rate as periods of abnormal operation related to GREDP and Base Point deviation and proper notification to the Market of changes to the value of REGP.  • Motion carried by voice vote with one abstention from the Independent Generator Market Segment.

  6. TAC Update from Nodal ATF NATF Concerns NATF agenda items for November 9th • AS Capacity Monitor Report • ERCOT Expectations on deployments from Reserves (both Capacity and Ramp) • Discuss ERCOT’s Appeal of NPRR275, Clarify QSE’s Ability to Make Changes to Ancillary Service Resource Responsibility In Real Time ERCOT expressed interest in NATF continuing to meet at least through the initial stages of Nodal Stabilization. With the blessing of TAC, NATF intends to meet the 1st quarter “as needed but at least monthly” and take an assessment at the April TAC meeting. Best way to track the status of issues are the documents posted in the ALL ISSUES section at: • http://nodal.ercot.com/docs/po/index.html • NATF expects ERCOT to continue updating NATF, TAC and the Board regarding the progress of the fixes and workarounds.

  7. TAC Update from Nodal ATF Additional Topics Questions? http://www.ercot.com/committees/board/tac/natf/ 7

  8. TAC Update from Nodal ATF Illustration of 11/9 topic What are ERCOT’s expectations regarding… A the required ramp rate? B the energy in 5 minutes? C the energy in 10 minutes? D the energy in 20 minutes? 10, 20, 25MW/MIN? 50, 100, 105MW? 100, 200, 250MW? 200, 400, 500MW? HSL 600MW NSRS 100MW 100MW / 20MIN = 5MW/MIN RRS 100MW 100MW / 10MIN = 10MW/MIN RegUp 50MW 50MW / 5MIN = 10MW/MIN • Market Design is primarily… • SCED Re-dispatch GTBD • Reg for Change in total Generation LSL 100MW http://www.ercot.com/committees/board/tac/natf/ 8

  9. TAC Update from Nodal ATF Appendix Ramp Available for SCED for Congestion Management 9 SURAMP = RAMPRATE – (RUSTELEM/ 5) SDRAMP = NORMRAMP – (RDSTELEM / 5) Where SURAMP/SDRAMP - SCED up/down ramp rate RAMPRATE- Normal Ramp Rate when RRS is not deployed or when the subject Resource is not providing RRS. Emergency Ramp Rate for Resources deploying RRS RUSTELEM/ RUSTELEM -Reg-Up/Down Ancillary Service Resource Responsibility designation provided by telemetry

  10. TAC Update from Nodal ATF Appendix Suggested Protocol Change via ERCOT Comments to NPRR277 10 SURAMP = RAMPRATE – (RUSTELEM* REGP / 5) SDRAMP = NORMRAMP – (RDSTELEM * REGP / 5) Where SURAMP/SDRAMP - SCED up/down ramp rate RAMPRATE- Normal Ramp Rate when RRS is not deployed or when the subject Resource is not providing RRS. Emergency Ramp Rate for Resources deploying RRS RUSTELEM/ RUSTELEM -Reg-Up/Down Ancillary Service Resource Responsibility designation provided by telemetry REGP- Percentage of Regulation Service for which Ramp Rate will be reserved in Real-Time. The value will be between one and zero. Suggested value 0.75