1 / 17

Status and Plans for EUROnu FP7 Design Study

Status and Plans for EUROnu FP7 Design Study. EUROnu = A High Intensity Neutrino Oscillation Facility in Europe. Introduction Aims Link to international activities Current status Plans. Introduction. Originally: Number of neutrino related DS for FP6

makani
Télécharger la présentation

Status and Plans for EUROnu FP7 Design Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe • Introduction • Aims • Link to international activities • Current status • Plans

  2. Introduction • Originally: • Number of neutrino related DS for FP6 • EURISOL (Beta beam) approved in round 1 • Others (e.g. NF) planned for later rounds • 2nd & 3rd rounds cancelled by EC! • New plan: • Submit to FP7 • But, CERN Strategy Group report in July 06 • Made important recommendations for us

  3. “…..studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal neutrino programme based on the information available in around 2012; Council will play an active role in promoting a coordinated European participation in a global neutrino programme” Strategy Group • Crucial R&D for 2nd generation facilities (post T2K) • Include 3 main European candidates: • CERN to Frejus Super-Beam • Neutrino Factory • Beta-Beam • Performance, “cost”, safety & risk comparison • Present outcome via SG • Done in collaboration, not competition

  4. EURO (or EUROnu) • Created end 2006 • 15 partners, coordinator STFC • Submitted proposal: May 07; total cost 14.5M€, EC 4.8M€ • Outcome: August 07 – ranked first, negotiate for 4.0M€ • Project started: 1st September 2008 • Duration: 4 years – completion in 2012, as required • Website: http://euronu.org- some information is public - more interesting stuff requires registration

  5. Partners Total: 24 Institutes 9 Countries

  6. Structure

  7. WP2: CERN to FrejusSuperbeam 3.5-5 Physics: WP6 WP5

  8. WP3: Neutrino Factory WP5 Physics: WP6 WP5

  9. WP4: Beta Beam Ion production Neutrino source Beam to experiment Ion Linac 30 MeV PR RI production Decay ring Br ~ 500 Tm B = ~6 T C = ~6900 m Lss= ~2500 m 8Li: g = 100 8B: g = 100 Acceleration Collection SPS Neutrino Source Decay Ring Beam preparationpulsed ECR Ion accelerationLinac, 0.4 GeV PS2 92 GeV 31 GeV . Acceleration to medium energy RCS, 5 GeV Detector Gran Sasso

  10. Baseline Beta Beam • 18Ne and 6He • studied in EURISOL FP6 DS • Updated Beta Beam: 8Li and 8B – higher Q isotopes WP4: Beta Beam • Baseline ions • ISOL method 18Ne 2x1013/s<8x1011/s6He 2x1013/s>1x1013/s • direct production being studied • ion production ring 8Li 1014/s 8B >1013/s

  11. WP4: Beta Beam Ion production Neutrino source Beam to experiment Ion Linac 30 MeV WP5 PR RI production Decay ring Br ~ 500 Tm B = ~6 T C = ~6900 m Lss= ~2500 m 8Li: g = 100 8B: g = 100 Acceleration Collection SPS Neutrino Source Decay Ring Beam preparationpulsed ECR Ion accelerationLinac, 0.4 GeV PS2 92 GeV 31 GeV . Physics: WP6 Acceleration to medium energy RCS, 5 GeV Detector Gran Sasso

  12. Delivering SG Aims • Funding: will deliver EUROnu obligations • Insufficient to meet SG requirements • Being addressed in two ways: • International collaboration: - associates in EUROnu - with IDS-NF - with other (mainly EC) projects • Request for additional CERN contributions: - through Nu Panel - particular focus on CERN skills/interest

  13. Associate Members • Some funding available for travel • Meetings possible at associates - Aachen, Germany - Argonne National laboratory, USA - Brookhaven National Laboratory, USA - Brunel, UK - Fermilab National Accelerator Laboratory (FNAL), USA - GANIL, France - INO, India - Institute of Applied Physics in Nizhny Novgorod, Russia - Joint Institute for Nuclear Research, Dubna, Russia - Lisbon, Portugal - TRIUMF Laboratory, Canada - University of Geneva, Switzerland - US Neutrino Factory and Muon Collider Collaboration - Virginia Polytechnic Institute, USA - Weizmann Institute, Rehovot, Israel

  14. International Collaboration • International Design Study for a Neutrino Factory • WP3 and IDS Accelerator study: same thing • full integration between WP5 & 6 and IDS • International Advisory Panel • Connection with International Activities • Membership: Ewart Blackmore (TRIUMF) • Swapan Chattopadhyay (CI) • Steve Holmes (FNAL) • Hitoshi Murayama (Tokyo) • Mike Zisman (LBL) – chair

  15. Some thought already given to this • Also suggested by IAP • Formal request from Nu Panel • Work in CERN EUROnu Team, on all WPs Request to CERN

  16. Status • Running for 15 months • Now 39 institutes “officially” involved • 1st annual report almost complete • Good progress towards milestones & deliverables • 26 EUROnu documents produced Plans • Complete fall 2012 • Aim to further increase collaboration • Deliver final report to Council via SG/SPC • Next step: CNI-PP??

  17. Conclusions • Coordinated study for future nu osc facilities • Performance, cost, safety, risk comparison • Deadline 2012 – that’s when we finish anyway! • Official part of CERN Strategy • Close international collaborations • Additional resources required to do complete job • Step after EUROnu: ESFRI RoadmapPreparatory Phase for new facility

More Related