(E)DR Magnet Design Overview

(E)DR Magnet Design Overview. ... for the Magnet System Group. Outline. Design Overview What is a detailed design? What are deliverables? Issues in the Design Process ‘Limited’ (E)DR Approach What can we expect with the existing constraints on funding and schedule?

mandy
Télécharger la présentation

(E)DR Magnet Design Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (E)DR Magnet Design Overview ... for the Magnet System Group Magnet EDR Overview

  2. Outline • Design Overview • What is a detailed design? • What are deliverables? • Issues in the Design Process • ‘Limited’ (E)DR Approach • What can we expect with the existing constraints on funding and schedule? • Integration of Areas, Systems, and all that Magnet EDR Overview

  3. (E)DR Magnet Design & Deliverables • Design for each magnet style: • Magnetic design 2D (and, if needed, 3D) magnetic field simulations to confirm specified field quality and magnet performance; • Pole profile and geometry optimization for better integrated field quality; • Mechanical and thermal analysis; • Magnet documentation. • Magnet documentation package should include at least: • Magnet specifications with all necessary parameters; • Results of magnetic field analysis as well as mechanical and thermal calculations. Magnet EDR Overview

  4. (E)DR Magnet Deliverables, cont. • Magnet Documentation, cont. • Magnet drawings - at a minimum cross-sections, transverse and longitudinal views, with all connections to power, water, and instrumentation and corresponding schematics; • Description of all materials: iron, copper, insulation, epoxies, cables, etc… • Description of magnet manufacturing technology: coil winding technique, epoxy impregnation, curing, stamping laminations, yoke and magnet assembly, etc… • General views of the magnet support structure with adjusting mechanisms • Drawing of the magnet support in the tunnel. Magnet EDR Overview

  5. Design Issues • Design issues and related items: • The design process and information flow, requires data exchange between different areas, regions, institutions, teams, and specialists. We should expect that a large fraction of time will be spent waiting for additional information, technical decisions, changes in specs, etc… • Integration with other sub-systems and making technical decisions for all areas simultaneously on the same issue and problem. • Finding professionals for magnet design and integration with the required experience. Magnet EDR Overview

  6. Design Issues, cont. • Converting R&D projects into useful results for EDR • The large fraction of specialists’ time needed for meetings, reports, reviews, & travel will have a significant impact on EDR progress • Changes in the lattice or general magnet parameters will cause magnet redesign and a corresponding design time increase • The late start of EDR • Industry cost estimation for different regions and firm ranks(?) Magnet EDR Overview

  7. Design Approach for an (E)DRwith Limited Resources • Priorities for detailed design effort need to be established - key magnets: complexity, cost, quantity (and/or all of the above) • Detailed design & cost estimate • Optimization of parameters, e.g. peak field vs. integral required • Conventional vs. superconducting • FMEA/Reliability • FY08 budgets do not appear to support any significant magnet engineering effort (for detailed design) Note: truth in labeling laws apparently do not apply to not-yet-approved projects Magnet EDR Overview

  8. Design Approach, cont. • Magnet reliability is a major concern • MTBT assigned for magnets in the range 10 – 20106 hrs • Reliability must be ‘built in’ – part of the design process – and addressed early in the project • FMEA – Failure Modes and Effect Analysis - is a structured, qualitative approach to understanding • FMEA need to be carried out on specific magnet detailed designs, representative of the magnet spectrum • This is an important ‘up front’ engineering task which is part of the design process and cannot be left to the end Magnet EDR Overview

  9. (E)DR – A magnet-centric assessment given the boundary conditions • (E)DR – time scale FY07-FY09 • FY2007 is over (funds are gone; magnet design not begun) • FY2008 has very limited resources for magnets… • FY2009 appears to have some additional resources for magnet detailed design (mostly rumor…) • The conclusion is that there will not be a significant number of magnet styles with detailed designs by FY2010 • Without detailed designs, the cost estimate will not be significantly more accurate or reliable • Consequences of deferring design efforts will not go unnoticed… Magnet EDR Overview

  10. (E)DR – Assessment, cont. • Ready for approval process in FY2010 (?) • Lack of (E)DR resources for magnet design compresses all of detailed design into the ‘pre-production’ and ‘early’ project phases • Pile-up of work on magnet designers, draftspersons, etc. • Potential schedule impact on vendors and machine installation • Competition for resources (and/or schedule problems) if all efforts are pushed downstream • Not a realistic schedule w/res to ~130 magnet designs Magnet EDR Overview

  11. Detailed Design  Integration Issues • (E)DR Magnets – ‘Interface/Integration’ Topics • Vacuum chamber (aka ‘beam pipe’) treatments • Power Systems • Coordination with Technical and Global Systems • AC Power • LCW system • Controls interfaces • Installation Does this get defined separately (and differently) for each Area System? • Kickers and Pulsed Magnets • R&D on fast pulsers is centered in DR effort • Separate effort for other Area Systems? • Is there a mechanism in the EDR approach to find a solution across Area System boundaries? Magnet EDR Overview

  12. Integration Issues, cont. • More general integration concerns across Area Systems • Common Design Standards • Coordination among an unknown number of independent work packages • Design Review Formalism • Cost Estimation Standards • Measurement & test • Separate facilities for each Area System(?) • Obviously not, but where does this issue get addressed? • ‘Global’ Reliability/Maintainability Studies • Materials/components • Processes • Operating regimes & environments Magnet EDR Overview

  13. Integration Issues, cont. • Kickers and Pulsed Magnets • R&D on fast pulsers is centered in DR effort • Separate efforts for other Area Systems? • Is there a mechanism in the EDR approach to find a solution across Area System boundaries? • There should be one person coordinating / integrating the overall fast pulser R&D • Kicker, Septum magnets, etc… • Superconducting Magnets – coordination / integration • Quadrupoles in cryomodules - Main Linac, RTML, e+ source • Differ only in energy range • Minimize number of different styles Magnet EDR Overview

  14. Conclusions • If resources are limited and magnet design is deferred • Cost estimate will not be significantly improved • Different people can apply different guesses but the ‘data’ will not have changed appreciably • Detailed design occurs later • In labs or in industry, it will require a greater number of engineers and designers in a shorter time period • The required technical oversight burden will be greater – more designs, less time – and will require more magnet engineers • Potential for ‘Pile-Up’ in schedule • Production facilities saturated • Alternative is more, less experienced, less qualified vendors • Costs will increase • More capital investment (tooling, production lines) • Risk of Installation Schedule issues • Late magnets will clog the system Magnet EDR Overview

  15. Conclusions, cont. • There are solutions • Admit to a more realistic schedule • No one believes this one… • Spread the (E)DR over 4 reasonably funded years (not 1 ¼ …) • More funding for FY08, FY09 • ‘Yeah, right…’ • Admit that the cost estimate will not be substantially more detailed or accurate • Rename the (E)DR to something closer to the truth… • Avoid another 2 years of ‘throw away’ effort on pseudo-designs for a not-more-reliable cost estimate…(aka ‘continuous fire drills’…) • Call it the “Enhanced Reference Design” and don’t claim any significant improvement in the cost estimate uncertainty • Or, why not a Realistic Schedule with Realististic Goals, consistent with actual resources… Magnet EDR Overview