1 / 6

Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012

Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012. Last week, the magnet warming was completed, and the access port to the HTS leads was opened and the MLI separated

marge
Télécharger la présentation

Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spectrometer SolenoidsMICO 194Steve VirostekLBNLJuly 25, 2012

  2. Last week, the magnet warming was completed, and the access port to the HTS leads was opened and the MLI separated • Initially, due to a shield piece that was in the way, the leads were not fully accessible, but it was confirmed using a mirror that lead ‘E’ failed • Earlier this week, the shield piece was moved away, and the failed lead was removed; all other HTS leads appeared to be undamaged • These 7 remaining leads (5 ea @ 500 A, 2 ea @ 250 A) all successfully carried 40 amps during our tests prior to warming up • Test data from the HTS lead manufacturer is currently being pursued for all installed and spare leads • A new lead has been installed in place of lead ‘E’, and the system will likely be fully reassembled by Friday • Analyses had showed that failed lead had exhibited resistive behavior during all training runs, but too low a level to trip quench system Current Status

  3. Accessing Leads Access hatch open with copper shield plates in front of HTS leads

  4. Lead Joints Top end joint for two of the HTS leads with voltage taps

  5. HTS Leads Top: recently failed lead; middle: previously failed lead; bottom: new lead

  6. Upcoming Plans • Likely to start pumpdown of insulating vacuum by Friday • Depending on recovery time of vacuum, cool down could start by August 6th • Still have 2750 liters of LHe on hand to be used for cooldown (some unknown amount of this has likely boiled off) • Plan to use a third Xantrex power supply to be sent back from RAL for the training • Power supplies will be used in manual mode for all testing at Wang