420 likes | 621 Vues
FDEM EM Constellation Phase 5 Project. Florida Division of Emergency Management EM Constellation Phase 5 Project. “Train the Trainer” Session November 3, 2011. FDEM EM Constellation Phase 5 Project. EMC Phase 5 Training Sessions. Training Sessions: 11/03/11
E N D
FDEM EM Constellation Phase 5 Project Florida Division of Emergency Management EM Constellation Phase 5 Project “Train the Trainer” Session November 3, 2011
FDEM EM Constellation Phase 5 Project EMC Phase 5 Training Sessions • Training Sessions: 11/03/11 • End User Training – 1pm to 2pm • Train the Trainer – 2:30pm to 4pm
FDEM EM Constellation Phase 5 Project EMC Phase 5 “Train the Trainer” Session • https://seoc.floridadisaster.org/emcx/ • Use your existing EMC Logins and Passwords • This site will be available anytime for your use • Note that until notified, this is NOT a production system to be used for an Activation
FDEM EM Constellation Phase 5 Project Primary User Interface Modifications
FDEM EM Constellation Phase 5 Project Primary User Interface Modifications • New Menu Bar at top of screen • Logout button replaces “Search” and “Site Index” buttons • “Responders” title removed • Icon Key button was moved to the right hand portion of the screen • Icon Key color additions: The icon key was modified to reflect color coding by status
FDEM EM Constellation Phase 5 Project Mission Status Color Coding
FDEM EM Constellation Phase 5 Project Mission Status Color Coding • Mission Status color coding: Highlighting the status of Missions on both the Icon Key and the Mission board • Red: Unassigned, Assigned, or Tasked • Yellow: Mobilizing, Enroute, or Update • Blue: On Scene • Green: Demobilizing or Complete • Grey: Cancelled or On Hold
FDEM EM Constellation Phase 5 Project Dashboard Views – Main Screen
FDEM EM Constellation Phase 5 Project Dashboard Views – Main Screen • Upon selection of a new Event, the user is asked to design the Dashboard • Selections are persistent through the user’s session and Event • Actual Dashboard Views can be easily placed in locations on one screen
FDEM EM Constellation Phase 5 Project Dashboard Views – Main Screen
FDEM EM Constellation Phase 5 Project Dashboard Views – Main Screen
FDEM EM Constellation Phase 5 Project Dashboard Views – Main Screen • Once Dashboard Views have been selected, using the “Design” button can allow the user to “drag and drop” the views anywhere on the screen • Each Dashboard View has a window available to close or minimize the application • Dashboard Views that are closed are added to a Catalog on the configuration screen for easy retrieval • The “View” selection removes the Configuration Screen
FDEM EM Constellation Phase 5 Project Dashboard – Mission Status Dashboard – Mission Status • Summarize the status of missions in a pie chart • Filter and display all missions by specific desk and reflect status • Summarize the status of missions in a pie chart • Filter and display all missions by specific desk and reflect status • Mouse-over the pie “slices” to obtain numbers for each Mission Status
FDEM EM Constellation Phase 5 Project Dashboard – Mission Status
FDEM EM Constellation Phase 5 Project Dashboard – Mission and Information Message Following Dashboard – Mission and Information Message Following • Allows a user via a checkbox to “follow” a mission or information message via the dashboard view • Changes to the mission or message will be easily identified • Clicking on the mission or message in the dashboard view takes the user to that specific mission or message • Missions and Information Messages must be separated and grouped • Allows a user via a checkbox to “follow” a mission or information message via the dashboard view • Changes to the mission or message will be easily identified • Clicking on the mission or message in the dashboard view takes the user to that specific mission or message • Missions and Information Messages must be separated and grouped
FDEM EM Constellation Phase 5 Project Dashboard – Mission and Information Message Following
FDEM EM Constellation Phase 5 Project Dashboard – Mission and Information Message Following
FDEM EM Constellation Phase 5 Project Dashboard – Weather Warning Dashboard – Weather Warning Dashboard – Weather Warning • Allows a user to track weather warnings and watches on a county basis • Users can link to the actual warning/watch message from the NWS feed • Allows a user to track weather warnings and watches on a county basis • Users can link to the actual warning/watch message from the NWS feed • Allows a user to track weather warnings and watches on a county basis • Users can link to the actual warning/watch message from the NWS feed
FDEM EM Constellation Phase 5 Project Dashboard – Weather Warning
FDEM EM Constellation Phase 5 Project Dashboard – SEOC Battle Rhythm • Allows a user to input activities (meetings, conference calls, briefings) • Dashboard view will display the time, location, activity name, and owner plus additional information • Activities will be color highlighted as the activity nears ( Upcoming = Blue, 30 minutes away = Yellow, 15 minutes away = Orange, Activity has started = Red)
FDEM EM Constellation Phase 5 Project Dashboard – SEOC Battle Rhythm
FDEM EM Constellation Phase 5 Project Dashboard – H+ Timer • Allows an administrator to enter an Event Name, Date/Time, and Description to start a timer for an Event • Original intent: Post-landfall Countdown
FDEM EM Constellation Phase 5 Project Dashboard – H+ Timer
FDEM EM Constellation Phase 5 Project Dashboard – Total Days Activated • Compiles the information collected in the H+ Timer • Allows an Administrator to enter a Date/Time, Event Name, Activation Level, and Description to calculate the days activated (to present) by level • Dashboard view will allow a selection by Event Name, Date/Year, and Activation Level and the user can print or export the results
FDEM EM Constellation Phase 5 Project Dashboard – Total Days Activated
FDEM EM Constellation Phase 5 Project Dashboard – Total Days Activated
FDEM EM Constellation Phase 5 Project Dashboard – Shelter Status • Dashboard View summarizes information from the Red Cross National Shelter System • Lists Shelters by county, which ones are open, and population counts • Must distinguish between Regular and Special Needs shelters
FDEM EM Constellation Phase 5 Project Dashboard – Shelter Status
FDEM EM Constellation Phase 5 Project Dashboard – SitRep • Dashboard View is based on information collected from EEI • Display will focus on county level statuses: • Counties at a Level I Activation • Counties with a specific local activation level • Counties under a local state of emergency • Counties that have issued a mandatory evacuation order • Counties that have issued a voluntary evacuation order • Status of County Offices (open or closed) • Status of County Schools (open or closed) • Dashboard View will reflect the color coding scheme presented in EEI (Red = Closed or State of Emergency = Yes, Activation Levels IV and III = Green, Activation Level II = Yellow, Activation Level I = Red) • Dashboard View will be in a tabular / bar chart format • Dashboard View will have a link to the County’s actual SitRep • Dashboard View will have a link to GATOR
FDEM EM Constellation Phase 5 Project Dashboard – SitRep:
FDEM EM Constellation Phase 5 Project Dashboard – Reports • Displays the reports typically run by an EMC user • Reports displayed on the Dashboard View can be printed or exported • Saved Reports can be launched by name from within the Dashboard View
FDEM EM Constellation Phase 5 Project Content Management Tools • Content Management Tools • A set of screens for Administrators to allow dynamic definition of 3 – 5 “pull down” lists for easy change of descriptions and to sort Mission Statuses, Mission Categories, Information Message Types, and other information.
Functionality Still In QA/Testing Mode FDEM EM Constellation Phase 5 Project
FDEM EM Constellation Phase 5 Project SRMN Integration (Mission “Orders”) • SRMN Integration (Mission “Orders” and Status Updates) • Logistics has been presented with a Kind Reference table which (when approved) will be the basis for Mission Order selection in EMC
FDEM EM Constellation Phase 5 Project SRMN Integration (Mission “Orders”) • SRMN Integration (Mission “Orders” and Status Updates) • The effort to link new screens to SRMN Kind Reference functions was delayed, and began on Monday of this week. In testing, the changes affected several Mission functions, including Supporting Missions, and these effects are being addressed by the EV Development Team • A recent request to save off multiple item orders as “templates” that can be recalled by name from within a “Packages/Kits” folder will result in significant code modifications (as Missions currently are not oriented for this type of ordering). Code changes to create this functionality are being made, and will be available soon
FDEM EM Constellation Phase 5 Project Supporting Missions / Info. Messages • Supporting Missions and Supporting Information Messages • Based on request to place Mission/Info Message “Following” selection button on primary screens. • Selecting this option will allow a Mission or Info Message to be created that is associated with (in support of) a Primary Mission or Info Message
FDEM EM Constellation Phase 5 Project Supporting Missions / Info. Messages • Supporting Missions and Supporting Information Messages • This function was affected by the changes in Kind/Reference Selections made by the SRMN Integration effort • Testing identified the need to alter how supporting missions are reflected in SRMN screens (will involve additional field creation) and how Updates are provided back to EMC (will involve a new column to be added to EMC) • These efforts are in progress and will be completed soon
FDEM EM Constellation Phase 5 Project Mission and Info. Message “Ribbon” • Mission and Information Message “Ribbon” • The Ribbon is a filtering function that will allow for easier searching to be completed within Mission and Info Message windows. • The Ribbon was affected by recent Mission Following testing efforts (which were affected by SRMN integration efforts) • The Ribbon will soon be in a final Testing Mode and will be delivered soon
FDEM EM Constellation Phase 5 Project EEI Enhancements • EEI Enhancements • A recent request to add the Status of Boiled Water Notices has uncovered problems within the existing code set with respect to status additions • The more appropriate location for status changes is in “Content Management”, and Emergency Visions is re-architecting this feature so that EEI can be modified easily at any time by an Administrator • This effort will be completed and available for testing soon
FDEM EM Constellation Phase 5 Project Next Steps • Make changes to software based on feedback from this Training Session (if applicable) • User Acceptance Testing on available functions (code on FDEM Servers) • Emergency Visions will move completed code from other functions to the FDEM Server when complete • Additional Training Sessions: • Via Webcast • Dates TBD by EMC Phase 5 Stakeholders’ Committee • Delivery on Flash-based End User Training Materials • New Functionality Review • End-to-End Training on all aspects of the Software (new employee)
Questions and Answers FDEM EM Constellation Phase 5 Project