1 / 3

Comprehensive DOE-BHSO Electrical Safety Review at C-AD: Ensuring Safety in Collider Operations

The DOE-BHSO Electrical Safety Review, conducted by Chris Seniuk, aims to enhance electrical safety protocols within the Collider-Accelerator Department (C-AD). Scheduled to begin on January 25, 2010, the review will cover 13 key areas, including ISM and electrical safety, labeling, wiring, and PPE requirements. A preliminary meeting with critical stakeholders will take place this Thursday. This thorough assessment aims to identify best practices and compliance with NFPA 70E standards, ensuring the safety of operations involving STAR and Phenix scheduled for January 27.

marja
Télécharger la présentation

Comprehensive DOE-BHSO Electrical Safety Review at C-AD: Ensuring Safety in Collider Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOE - BHSO Electrical Safety Review at C-AD, Physics and Instrumentation Collider-Accelerator Department 1-19-2010 Take 5 for Safety

  2. DOE-BHSO Electrical Safety Review • Chris Seniuk of BHSO • 1 week review – starting on Monday 1/25/10 • STAR and Phenix scheduled for 1/27/10 (tentative) • Preliminary meeting this Thursday with Jim Durnan, Chris Seniuk and C-AD • DOE Checklist covers 13 areas and is 23 pages long • C-AD contacts – Jon Sandberg, Peter Cirnigliaro, Ray Karol, Ed Lessard

  3. Areas to be covered • ISM and electrical safety • Labeling • Wiring • Cable Trays • Work Planning (worker-planned, procedures, permits) • Electrical working on or near permits • Design • Electrical Safety Committee • NFPA 70E safe work practices and training • PPE • Testing of gloves, shorting sticks, insulated tools and portable instruments • Training

More Related