An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REPUBLIC OF TURKEY MINISTRY OF TRANSPORT, MARITIME AFFAIRS AND COMMUNICATIONS GENERAL DIRECTORATE OF HIGHWAYS

  2. GENERAL DIRECTORATE OF HIGHWAYS BUILD – OPERATE – TRANSFER (BOT) MOTORWAY PROJECTS MAY 2012

  3. EXISTING MOTORWAYS IN TURKEY İstanbul Adapazarı Gerede Düzce Bursa Ankara İzmir Aydın Niğde Şanlıurfa Mersin 2.080 km 2.119 km MotorwaysUnderOperation TOTAL MOTORWAY LENGTH : 2 163 km 44km MotorwaysUnderConstruction TOPLAM 2163 km TOTAL COST : 20 Billion $

  4. Total Vehicles: 390 million (2011) • Total Toll : 890 000 million TL (2011)

  5. 12/a 2 414 km 357 km 6 370 km 4/b 12/b 320 km 12/b 4/a 1 10 908 km 202 km 12/b 112 km 421 km 77 3 4 km 8 342 km 535 km 5/a 9 5/b 490 km 175 km 155 km 445 km 11 MotorwaysunderOperation(As of January 2011) 2090 km MotorwaysTenderedBy B.O.T Model 421 km Motorways not openedtotraffic MotorwaysUnderConstruction(As of January 2011) 29 km 44 km Planned B.O.T Projects: Length(km): Planned B.O.T Projects: Length(km): 1- Gebze-Orhangazi-İzmir Motorway 9- Afyonkarahisar-Antalya-Alanya Motorway 421 (awarded) 490 10- Sivrihisar-Bursa Motorway 202 342 3- Ankara-Niğde Motorway 11-Şanlıurfa-HaburMotorwayand Diyarbakır Junc. 445 4/a- Ankara-Kırıkkale-Delice Motorway 112 12/a- Gerede-Merzifon Motorway 357 4/b- Delice-Samsun Motorway 320 12/b- Merzifon-GürbulakMotorway 908 175 5/a- Aydın-Denizli Motorway 155 5/b- Denizli-Burdur Motorway 6- Kınalı-Tekirdağ-Çanakkale-Balıkesir Motorway 370 7- SabuncubeliTunnel 4 8- Ankara-İzmir Motorway 535 BOT MOTORWAY PROJECTS BY 2023 Türkgözü Zonguldak Kınalı İstanbul Samsun Rize Trabzon Merzifon Adapazarı Tekirdağ Gebze Gerede Düzce Bursa Pasinler Çanakkale Ankara Sivas Erzurum Refahiye Delice Balıkesir Gürbulak Afyonkarahisar Nevşehir İzmir Denizli Malatya Diyarbakır Aydın Niğde Habur Burdur Şanlıurfa Antalya Akçakale Mersin Alanya 414 2- North Marmara Mot.orway

  6. BOT MOTORWAY PROJECTS UNTIL 2023 • MOTORWAY PROJECTLENGTH(Km) • 1- Gebze-Orhangazi-İzmir Motorway 421 • 2- Kuzey Marmara Motorway (Including 3. BosphorosBridge) 414 • 3- Ankara-Niğde Motorway 342 • 4-a Ankara-Samsun MotorwayAnkara-Kırıkkale-Delice Section 112 • 4-b Ankara-Samsun MotorwayDelice-Samsun Section 320 • 5-a Aydın-Denizli-Burdur MotorwayAydın-Denizli Section 175 • 5-b Aydın-Denizli-Burdur MotorwayDenizli-Burdur Section 155 • 6- Kınalı-Tekirdağ-Çanakkale-Balıkesir Motorway 370 • 7- SabuncubeliTunnel 4 • 8- Ankara-İzmir Motorway 535 • 9- Afyon-Antalya-Alanya Motorway 490 • 10- Sivrihisar-Bursa Motorway 202 • 11 Şanlıurfa-HaburMotorwayand Diyarbakır Junction 445 • 12/a Gerede-Merzifon-GürbulakMotorway Gerede-Merzifon Section 357 • 12-b Gerede-Merzifon-GürbulakMotorwayMerzifon-GürbulakSection 908 • Total of Planned 2023 B.O.T MotorwayProjects: 5500

  7. 12/a 15 2 414 km 90 km 24 357 km 6 250 km 370 km 4/b 12/b 320 km 12/b 4/a 1 10 908 km 202 km 12/b 112 km 421 km 17 13 540 km 23 560 km 21 85 km 7 540 km 3 20 4 km 8 230 km 19 342 km 14 535 km 460 km 18 650 km 5/a 425 km 9 5/b 490 km 175 km 155 km 445 km MotorwaysunderOperation(As of January 2011) 2090 km 11 50 km 22 16 250 km Planned 1.GroupMotorwayProjects MotorwaysTenderedBy B.O.T Model 1417 km 421 km ConstructedMotorwaysthatdidn’topenedtotraffic MotorwaysUnderConstruction(As of January 2011) 29 km 44km Planned B.O.T Projects: Length(km): Planned B.O.T Projects: Length(km): Planned B.O.T Projects: Lengtk(km): 421 (Has beenTendered) 1- Gebze-Orhangazi-İzmir Motorway 9- Afyonkarahisar-Antalya-Alanya Motorway 17- Delice-Sivas-Refahiye Motorway 540 490 18- Nevşehir-Diyarbakır Motorway 10- Sivrihisar-Bursa Motorway 650 202 342 3- Ankara-Niğde Motorway 11-Şanlıurfa-HaburMotorwayand Diyarbakır Junc. 445 4/a- Ankara-Kırıkkale-Delice Motorway 112 12/a- Gerede-Merzifon Motorway 20- Sivas-Malatya Motorway 230 357 4/b- Delice-Samsun Motorway 320 12/b- Merzifon-GürbulakMotorway 908 21- Trabzon-Malatya Motorway 540 175 5/a- Aydın-Denizli Motorway 13- Bozüyük-AfyonkarahisarMotorway 85 22- Şanlıurfa-Akçakale Motorway 50 155 5/b- Denizli-Burdur Motorway 14- Afyonkarahisar-Niğde Motorway 425 23- Rize-Diyarbakır Motorway 560 6- Kınalı-Tekirdağ-Çanakkale-Balıkesir Motorway 370 90 15- Düzce-Zonguldak Motorway 7- SabuncubeliTunnel 4 250 16- Alanya-Mersin Motorway 8- Ankara-İzmir Motorway 535 BOT MOTORWAY PROJECTS BY 2035 Türkgözü Zonguldak Kınalı İstanbul Samsun Rize Trabzon Merzifon Adapazarı Tekirdağ Gebze Gerede Düzce Bursa Pasinler Çanakkale Ankara Sivas Erzurum Refahiye Delice Balıkesir Gürbulak Afyonkarahisar Nevşehir İzmir Denizli Malatya Diyarbakır Aydın Niğde Burdur Şanlıurfa Habur Antalya Akçakale Mersin Alanya Planned 2.GroupMotorwayProjects 7542 km 2- North Marmara Mot.orway 414 19- Diyarbakır-GürbulakMotorway 460 24- Pasinler-TürkgözüMotorway 250

  8. BOT MOTORWAY PROJECTS UNTIL 2035 km 1- Gebze-Orhangazi-İzmir Motorway(awarded) 421 2- North Marmara Motorway (Including 3. BosphorosBridge) (tendering)414 3- Ankara-Niğde Motorway(to be tendered in 2012) 342 4-a Ankara-Samsun Motorway Ankara-Kırıkkale-Delice Section 112 4-b Ankara-Samsun Motorway Delice-Samsun Section 320 5-a Aydın-Denizli-Burdur Motorway Aydın-Denizli Section 175 5-b Aydın-Denizli-Burdur Motorway Denizli-Burdur Section 155 6- Kınalı-Tekirdağ-Çanakkale-Balıkesir Motorway 370 7- SabuncubeliTunnel 4 8- Ankara-İzmir Motorway 535

  9. 9- Afyon-Antalya-Alanya Motorway 490 10- Sivrihisar-Bursa Motorway 202 11- Şanlıurfa-HaburMotorwayand Diyarbakır junction 445 12-a Gerede-Merzifon-GürbulakMotorway Gerede-Merzifon Section 357 12-b Gerede-Merzifon-GürbulakMotorway Merzifon-GürbulakSection 908 13- Bozüyük-AfyonkarahisarMotorway 85 14- Afyon-Niğde Motorway 425 15- Düzce-Zonguldak Motorway 90 16- Alanya-Mersin Motorway 250 17- Delice-Sivas-Refahiye Motorway 540 18- Nevşehir-Diyarbakır Motorway 650 19- Diyarbakır-GürbulakMotorway 460 20- Sivas-Malatya Motorway 230 21- Trabzon-Malatya Motorway 540 22- Şanlıurfa-Akçakale Motorway 50 23- Rize-Diyarbakır Motorway 560 24- Pasinler-TürkgözüMotorway 250 Total length of B.O.T. Projects : 9.600 km

  10. TOTAL COST OF BOT MOTORWAY PROJECTS BY 2035 50 Billion $

  11. SomePrinciples of MotorwayProjectsby BOTMethod Trafficguarantee Tollupdateaccordingtoannualinfilation Taxallowances Partialopeningoptions Land acqusitioncostssharedortotallypaidbyKGM

  12. Gebze-Orhangazi-İzmir Motorway BOT Project

  13. 421 km G.O.İ .MOTORWAY PROJECT Türkgözü Kınalı İstanbul Samsun Rize Trabzon Merzifon Adapazarı Gebze Gerede Bursa Pasinler Ankara Sivas Erzurum Refahiye Balıkesir Gürbulak Afyonkarahisar Nevşehir İzmir Malatya Diyarbakır Aydın Habur Şanlıurfa Akçakale Mersin Alanya Length: 421 km Cost: 6,5 billion $ Duration of thecontract: 22 year&4 months) ( including 3 km longsuspensionbridge)

  14. Gebze-Orhangazi-İzmir Motorway Contractor: NÖMAYG JointVenture N: Nurol Ö: Özaltın M: Mak-Yol A: Astaldi Y: Yüksel G: Göçay

  15. NORTH MARMARA MOTORWAY BOT PROJECT Section III-95 km motorwaywith 3rdBosphorusBridge

  16. NORTH MARMARA MOTORWAY 1875 m longsuspensionbridgewithrailroad

  17. NORTH MARMARA MOTORWAY BIDDERS: 1- SALINI – GÜLERMAK JV 2- IC İÇTAŞ - ASTALDİ JV 3- MAPA İNŞAAT VE TİCARET A.Ş. 4- CENGİZ - KOLİN – LİMAK - MAKYOL JV