90 likes | 204 Vues
E05-115 experimental setup in JLab Hall C (2009). HES HKS meeting. 8Nov 2010 T.Gogami. Content. HKS GEANT Committed NMRPort , Chmaber extension2 , flange MaterialList Moller scattering differential cross section in Lab system. Committed ( svn ). src / ChamberExtension2.cc
E N D
E05-115 experimental setup in JLab Hall C (2009) HES HKS meeting 8Nov 2010 T.Gogami
Content • HKS GEANT • Committed • NMRPort , Chmaber extension2 , flange • MaterialList • Moller scattering differential cross section in Lab system
Committed (svn) • src/ • ChamberExtension2.cc • CEF.cc • NMRPort.cc • HKSDetectorConstruction.cc • include/ • ChamberExtension2.hh • CEF.hh • NMRPort.hh • HKSDetectorConstruction.hh
Committed (svn) • /src • MaterialList.cc • /include • MaterialList.hh • Harver • SUS304 • Concrete
Concrete Concrete
Moller scattering CM==> Lab http://lambda.phys.tohoku.ac.jp/~gogami/HES-HKS/Moller_lab_cm/moller_lab_cm.pdf
Moller cross sectiontheta and momentum dependencein Lab system 2000 ×2000 theta momentum GEANT uniform gen. Collimator (-3cm , 12C) HES acceptance >3 [deg] collimator OFF HES
Summary and to do • Summary • HKS GEANT • Committed (subversion) • NMRPort , Chmaber extension2 , flange • MaterialList • Moller scattering • HES cannot accept Moller electrons • to do • Analysis • ee+ background • reconstruct real xx’ distribution with simulation • rejection code • Time difference between ee+ and particles on optics. • Residual of chambers for each arm. • HES tracking • Strangeness 2010 in KEK • registration has been done !
End 11/6 時点