1 / 8

Prevention of the landslide for Jing-Jiu Railway Lane

Prevention of the landslide for Jing-Jiu Railway Lane. Name: Lu Bin 4066415 Lu Tong 4075926. Introduction of Landslide. Definition The reasons for causing landslide *Hydrological and geological conditions

Télécharger la présentation

Prevention of the landslide for Jing-Jiu Railway Lane

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prevention of the landslide for Jing-Jiu Railway Lane Name: Lu Bin 4066415 Lu Tong 4075926

  2. Introduction of Landslide • Definition • The reasons for causing landslide *Hydrological and geological conditions *External effect ( Earthquake, Rainfall, Unreasonable projects, etc) • The harm of landslide Personal safety, property, equipment, environment, etc

  3. The importance of preventing the landslide for Jing-Jiu Railway Lane • It is one of the most significant railway lane through the south and north in China! • The geology is complex along the route! • There are many mountains with the track! • The rainfall is heavy, especially in south of China such as JiangXi province! • It is necessary for safety!

  4. The previous accident caused by landslide! • 2002,8,20 Caused by Rainstorm, Nanchang, The railway of Jing-Jiu paused for 6hrs

  5. The measures for preventing landslide • Find the problems as early as possible • Prevention by predicting • Identify geological conditions • Comprehensive management needed • Completely solved • No troubles afterwards!

  6. The methods adopted in Jing-Jiu • 1.Reduce and eliminate the negative effect of surface and underground water Drill horizontally, drill vertically, vertical pump, etc • 2.Improve the strength of rock Decrease slope and load, construct Retaining Wall, pre-stressed bolt, etc

  7. Project cases

  8. Project cases

More Related