1 st quarterly presentation on Electrical ENGINEERING Department

1 st quarterly presentation on Electrical ENGINEERING Department. Presented By : Dhritiman Nath , ET(Elect). Contents. Quarterly Report. Classroom. Attended classes arranged by the department as per training schedule.

maryn
Télécharger la présentation

1 st quarterly presentation on Electrical ENGINEERING Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1st quarterly presentation on Electrical ENGINEERING Department Presented By: DhritimanNath, ET(Elect)

  2. Contents

  3. Quarterly Report

  4. Classroom • Attended classes arranged by the department as per training schedule. • 10 nos. of classes have been conducted till now. • Topics covered in these classes are – • Introduction to Oil India Limited • Electrical Engineering Department functions • Regulations • Safety management system • DPS-14.45MW/ DPS – 20.28 MW • Hazardous Area Classification • HT network/ LT network • Transformers

  5. Continued….. • Classes for “presentation skill development” were arranged by the department • Three nos. of classes have been conducted till now • The topics covered in these classes are – • Qualities of a good presenter • Presentation lab • Impromptu Speech

  6. Feedback • A presentation is given after completion of training in a section every fortnight. • Four nos. of presentations were given till now. • The topics of the presentations were – • Kothaloni OCS & GCS • Lighting system in a ACSCR drilling rig • Starting system of 2*14.45 MW gas turbine and Emission Gas Analyser • NIA-MTDC power supply system

  7. OIL INDIA LIMITED • Oil India Limited has a authorized capital of 2000crore and a paid up capital of 601.14crore. • During FY 2013-2014, Crude OIL Production – 3.409 MMT Natural Gas Production – 2718 MMSCM LPG Production – 43570 tonnes • Oil India Limited is producing about 10% of the total in-house crude oil production of India.

  8. Role of Electrical Department • Oil India Limited has its own captive power generation facility along with transmission and distribution networks. • Electrical Department is responsible for providing reliable and quality power to all the installations. • Power is supplied to field operations, LPG plant, Industrial and Civic areas. • Services are provided to Drilling & Work-over rigs, Production installations, Industrial and Civic installations, Pipelines etc. across the organization.

  9. Major Consumers Drilling & work-over rigs Industrial Area Production Installations Electrical Department Housing/Oil Hospital/Oil market/R&D complex LPG Water supply

  10. Electrical Department • Electrical Department has 8(eight) sections – • Project • Rigs • Generation • Transmission & Distribution • SS • Field Operation & Maintenance • Planning & Administration • Electrical Workshop

  11. Project • Project – • Field installations – Looks after all the projects related to field installations such as OCS, GCS etc. • Civic Installations – Looks after the projects in Duliajan oil township. • Cable – Maintain all LT & HT UG cables, cable fault location and cable related breakdown. • 95 + no of projects are currently under process.

  12. Various Projects-

  13. Kothaloni OCS Schematic CODP GAS – OIL Separation Area De- oiler Pump FWD pump Aerat-ion plant Manifold Power House

  14. Rig • Provide electrical services during operation (24X7) of drilling and work-over rigs. Oil India Limited has – • 9 drilling rigs • 14 workover rigs • 6 Charter hired drilling rigs • 6 Charter hired workover rigs • Provide electrical services during rig-up and rig-down. • Maintenance of rig electrical equipment in various rigs. • Provide security lighting services in drilling locations. • Provide services for safe movement of rig equipment.

  15. Continued…. • Maintenance of air conditioning equipment in rig PCRs. • Provide electrical services for procurement of new rig equipment. • Procurement of spares for rig electrical equipment. • Provide services for charter hired rigs. • Rig electronics laboratory for calibration, testing of various electronics components/parts. • Rig workshop for overhauling of drilling motors, alternators etc.

  16. Power House • Duliajan Power Station has two Westinghouse make W191G gas turbine generator units. • Power House has currently 2* 14.45 MW gas turbines. • 1st unit was commissioned on 8.5.1977 2nd unit was commissioned on 9.4.1977 • The generated power caters to following loads – • Field installations in & around Duliajan • LPG plant • Housing & Civic amenities OIL Township

  17. Continued… • Duliajan Power House has “SIMATIC 555” PLC control system. • The gas turbine runs on Brayton cycle. P 2 3 Q 1 4 V

  18. Gas turbine working 2 3 14 Compressor Turbine Combustor (Q)

  19. Spark Plug Permanent Magnet Generator GT Combustor Basket

  20. Transmission & Distribution • Power is transmitted and distributed through the networks of Overhead lines. • The system has both H.T. and L.T. networks for distribution of power. • Within OIL township, power is distributed to places like RCE office, Bihutoli, R&D, Oil market, Zaloni club etc. • Currently, approximately 70 KMs of overhead lines are in use for power distribution.

  21. Continued… • Maintenance of overhead lines, poles, street lights. • Installation and maintenance of dropout units. • During fault, restoration of power as early as possible to reduce down time.

  22. 33 KV RING 11/33 KV SWITCHYARD W-208 GCS8 OCS8 SS-C OCS 3 OCS 2 SS-A GCS2 OWS SS D MP7 NWS GCS-6 WELL 80 PONTOON W-240 W-254 NEW PONTOON OCS -6 OCS-1 GCS 1B C GROUND South bank

  23. 11KV RING MTDC SS-E SS-7 W203 NIA SS-6 GCS4 NIAN D+107 G NIAC LPG PH 11/33 KV Switch yard W21 DPS SS D W57 DNPL W50 DD SS SS B TINGRI GCS5 BBARI TDX DX

  24. 3.3 KV RING POWER HOUSE W-53 GCS-5 BIHUTOLI SS-5 SS-4 SS-1 MEDICAL GUEST HOUSE SS-3 SS-2

  25. Executive Development Programme • From16 th March to13th of April, attended EDP • Executives from various department came and give presentation about their department • We had a class on sexual harassment, team building, soft skill development also • Also visited various CSR projects like – • Rehabilitation Centre • HTPC • SasoniMeerbeel • Visited Moran field, S3 drilling rig, Digboi field

  26. Recall • Quarterly Report • Oil India Limited • Electrical Department

  27. Thank you