New York State Department of Transportation. SR 427 over Chemung River Design-Build Project PIN 6039.11, Contract No. D900019 Town of Chemung, Chemung County Request for Qualifications Informational Summary April 23, 2014.

matsu
Télécharger la présentation

New York State Department of Transportation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New York State Department of Transportation SR 427 over Chemung River Design-Build Project PIN 6039.11, Contract No. D900019 Town of Chemung, Chemung County Request for Qualifications Informational Summary April 23, 2014

  2. SR 427 over Chemung RiverDesign-Build Project (PIN 6039.11)Agenda • Project Overview • Quality Control & Quality Assurance • Procurement • Questions and Answers

  3. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Rules of Contact Catherine Traina Attn: SR 427 over Chemung River Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6th Floor Albany, New York 12232 Catherine.Traina@dot.ny.gov

  4. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Agenda • Project Overview • General Location • Goals • General Scope of Work • Utilities • Quality Control & Quality Assurance • Procurement • Questions and Answers

  5. SR 427 over Chemung River Design-Build Project (PIN 6039.11) General Location

  6. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Goals • Replace aging structure over Chemung River • Ensure coordination with all utility owners, third parties and any adjacent construction projects • Ensure a long-service life for all Project elements to satisfy long term preservation goals • Maximize the benefit of the public investment in the Project and provide the best value to the Department • Deliver the Project safely, on schedule & within budget

  7. SR 427 over Chemung River Design-Build Project (PIN 6039.11) General Scope of Work • Construct new bridge over Chemung River • Maintain traffic on-site throughout construction • Use of off-site vehicular detours is prohibited as this is the only crossing, not prone to flooding, which links the Village of Wellsburg to Interstate 86. • Construct new approach pavement • Design and construct scour resistant piers and channel banks

  8. SR 427 over Chemung River Design-Build Project (PIN 6039.11) General Scope of Work (Continued) • Demolish existing structure and foundation • Construct new USGS gaging station • Demolish old USGS gaging station • Avoid existing environmental constraints • Threatened and endangered species • Farmlands • Wetlands • Relocation and/or preservation of existing utilities • Remediation and disposal of asbestos containing materials

  9. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Utility Coordination – Existing Utilities • Aerial Facilities on east side paralleling existing structure • Aerial facilities paralleling Wilawana Road on south abutment area • Utility services to USGS gaging station

  10. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Environmental Considerations Issue Comments • Wetlands Forested wetlands (Federal) in NE quadrant. No permits obtained by NYSDOT for impacts to this wetland. • Surface Waters Chemung River - Class A Stream (in-stream work restrictions 3/15 to 6/30), NWP #3 w/ PCN (NYSDOT), Individual 401 WQC (NYSDOT) • Stormwater Management SPDES permit > 1 acre disturbance (contractor/consultant based on Final Design), Erosion & Sediment Control Plan • Ecology/Wildlife No Effect – Federal Species (FHWA Concurrence). State Listed Mussels – Mussels Survey, Relocation, and Monitoring – NYSDEC Coordination and Permits • Cultural Resources The existing right of way has been cleared by NYSDOT Region 6 Cultural Resource Coordinator as previously disturbed soils. • Asbestos Asbestos-containing sheet packing is located between the tops of the abutments and the deck slab at both ends of the bridge. Most of this material is presently covered by the bridge deck, although the edges of this sheet packing are exposed and visible at various locations. Estimated total amount is 93 square feet. • Farmlands Active farmlands near project limits in NE and NW quadrants. Farmer access to farmlands needs to be maintained during construction. • USGS Active gaging station located in SW quadrant. Replacement/relocation needs to be coordinated with USGS.

  11. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Federal Wetlands – Northeast Quadrant

  12. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Farmlands and Access Road – Northwest Quadrant

  13. SR 427 over Chemung River Design-Build Project (PIN 6039.11) USGS Gaging Station – Southwest quadrant

  14. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Agenda • Introductions and Opening Remarks • Project Overview • Quality Control & Quality Assurance • Procurement • Environmental • Questions and Answers

  15. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Quality Control (QC) • QC is Design-Builder’s Responsibility • Design-Builder shall be required to develop a QC Plan covering both Design QC and Construction QC • Design-Builder shall appoint a QC Manager responsible for Project QC • Design QC shall be by the Designer in accordance with the QC Plan • Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder) • Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder) • The Materials Testing Firm shall report to the Construction Inspection Firm

  16. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Quality Assurance (QA) • Design & Construction QA is Department’s responsibility • The Department may utilize an independent Consultant to perform QA of the Design-Builder’s Designs • Department Staff will perform Construction QA • RFQ Section 1.9 covers QA/QC • RFP will describe in detail the Department’s QA role for the project

  17. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Agenda • Introductions and Opening Remarks • Project Overview • Quality Control & Quality Assurance • Procurement • Schedule • Contract Information • SOQ Evaluation and Selection • Additional Information and Website • Questions and Answers

  18. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Procurement Schedule

  19. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Contract Information • Lump Sum Design-Build Contract • Two Step Design-Build Procurement Process • Project Schedule • Total Duration 20 Months +/- • There will be a Payment Schedule provided in the RFP • Stipend Amount was provided in the RFQ • Liquidated Damages may be imposed for missed milestones and/or missed Project completion date • ROW by NYSDOT • Construction Related Permits (i.e., Staging Area) by Design-Builder

  20. SR 427 over Chemung River Design-Build Project (PIN 6039.11) SOQ Evaluation and Selection • Pass/Fail Evaluation Factors • Legal; • Financial; • Backlog Capacity; • Vendor Responsibility; and • Quality Evaluation Factors • Organization and Key Personnel (30%) • Experience of the Firms (25%) • Project Understanding (15%) • Past Performance (25%) • Compliance with SOQ Format and Organization (5%)

  21. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Additional Information • Responses to Proposer Questions will be posted on the Project Web Site • Final date for receipt of Questions on RFQ May 7, 2014 • There will be a Buy America Clause • There will be a DBE Participation Goal defined in the RFP • RFQ Section 1.10 covers Insurance & Bonding

  22. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Additional Information (continued) • Reference Information which have been or will be posted on the Project Web Site: • Final Design Report and Environmental Assessment (multiple files) • STE 67-04 Record Plans • ER-116 Record Plans • D 262148 As-Built Plans • Asbestos Survey Report • Wetland Location Map (approximate) • Bridge Inspection Reports • Record Geotechnical Borings • Existing surface dtm and Microstation files • Existing highway boundaries and ROW acquisition maps

  23. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Project Website https://www.dot.ny.gov/main/business-center/designbuildproject7

  24. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Project Contact Catherine Traina Attn: SR 427 over Chemung River Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6th Floor Albany, New York 12232 Catherine.Traina@dot.ny.gov

  25. SR 427 over Chemung River Design-Build Project (PIN 6039.11) Questions and Answers Questions??