An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRT operation scenario • Gas Leaks status • Towards 100 kHz running

  2. Active gas leaks: test results • Tests done just after the run. • All leaks are at the exit of the detector. • Color coding corresponds to a size of the leak. • No change in leak status before a repair work started (~3 months.) Barrel M3 M2 M1

  3. Active gas leaks: test before and after repair EC-A Before After EC-C

  4. TRT leak summary • Leak repair is not possible for the barrel TRT. • Leak repair work including a preventive one has been carried out for both ECs (finished 13th of June, all ECs closed, no more interventions are planned). • Few large and small leaks were repaired but some situated in inaccessible areas. • For the cases when a leak was not fully repaired the installed tooling allows to bring a regulation point close to the detector what makes easy to control the leak rate. • A presence of O2 (source of Ozone) in the active gas mixture is mandatory to ensure stable operation. • Amount of O2 (3% at base line mixture) is under revision now but it does not seem that it can be significantly reduced. • We shell expect that the leaks will get worse with an increase of luminosity. • For the End-caps repair work allowed to move the regulation point close to the detector • After gas system upgrade we shell expect better leak rate regulation and operation stability. By how much- still to be answered!

  5. Operation scenario • Exact operation scenarios to be studied and discussed. Here are some preliminary thoughts . • Start physics data taking in 2015 with Xe-mixture – still to be confirmed if it is possible at a reasonable price. • Any way the limiting factor of “for how long” is amount of money allowed to be spent for Xe (current price is ~ 8.6 CHF/l). • When losses will become inacceptable we will start using Ar-based mixture in some parts of the detector, which have minimum impact on physics. • Maximum fraction of the detector running with Ar-mixture before a complete change of the active gas is still to be defined. What our choices depend on?

  6. Start of the RUN2 with Xe-mixture Configuration in p-Pb run) HL/LL ratio Direct Xe-mixture flow ~1-1.3 l/h Ar-mixture All other large leaks were under regulation Total Xe loss at that period was ~170-200 l/day • Problems: • Did not manage to make good gas exchange in the barrel modules 9-12. • Group of modules type 1 (29-32) has 2 holes in the pipes (difficult to control) • Gas gain in wheels 1 and 6 was may be by 10% less. • Very difficult to keep other parts under control (env. gas breakthrough, accumulation of N2, large Xe losses – hope to be better in 2015 run). • Clearly see Ar shaping issue for the EC.

  7. Start of the RUN2 with Xe-mixture • Worst scenario: • We can not control EC A wheels 1, 4 and 6. • We can not control groups of modules Type 1 9-12 and 29-32. • In that case gas losses will be ~240 l/day: • direct ~ 5*1.2 = 6 l/h • Indirect ~ 4 l/h (regulation require some gas to come out (many lines) • 7.2 m3/month * 10 months =72 m3 => *8.6 CHF/l = 619 kCHF • Best scenario: • All modules can be controlled • In that case gas losses will be ~140 l/day: • Indirect ~ 6 l/h (regulation require some gas to come out (many lines) • 5.2 m3/month * 10 months = 52 m3 => * 8.6 CHF/l = 447 kCHF • Both evaluations have large uncertainties. • ATLAS will give us the limit. • But two things should be done. • Accumulate maximum Xe in 2013 and 2014 + what comes in 2015 • Find chipper Xe (Russian supplier)

  8. Ar-mixture: some constrains to be taken into account Ar/CO2/O2 70/27/3 Straw efficiency >95% (the same as for Xe) s=130 mm Xe Drift-time accuracy, mm Ar Working point!? Voltage, V Unbiased residual Biased residual In the Barrel and ECs gas gain is limited by cross talk The limit is ~2.5*104 For wheels type B this effect might be stronger!

  9. Absence of Ar-shaping in some EC boards (greenareas)

  10. Effect of Xe shaping for Ar mixture Ar/CO2/O2 70/27/3 Signal with after pulse Average signal for beta source at GG =2.5*104 Maximum probability for after pulse as a function of gain. After pulse probability function for different GG

  11. Background suppression as a function of ETHA • Shell we preserve TR functionality in the calorimeter crack region? • What ETHA regions are the most important for trigger?

  12. Operation scenarios Candidates to be given up in 2015

  13. Questions to be discussed and answered • The list should be continued and by the end it shell be the input for MC studies. • What modules we shell start operating with Ar first? • Shell it be a large step (like 1st layer of barrel modules) or one by one (MC sample production)? • Does it make a sense to leave only outer layer of the barrel TRT with Xe. • Is it better in the barrel to go layer by layer or better turn on Ar-mixture in some blocks of modules. • Does it make a sense to operate Barrel with Ar mixture and ECs with Xe? • Does it make a sense to have only one EC (one barrel sector, part of the barrel …) with Xe mixture? • Which fraction of the detector should be considered to stay with Xe mixture before turning everything to Ar. • What constrains are to take any decision (FE electronics settings, Compression in RODs, recalibration, MC samples for physics, ?????) • ………………………………….??????????? • Discussion!