Baseline (geophysical) interferometer 2010.9.27 Plan

Baseline (geophysical) interferometer 2010.9.27 Plan 1. Two baseline-monitor interferometers (~2.5km) along LCGT 2. Sensors and benchmarks for monitoring environmental condition Purpose and Targets [Baseline interferometers]

meira
Télécharger la présentation

Baseline (geophysical) interferometer 2010.9.27 Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Baseline (geophysical) interferometer2010.9.27 • Plan • 1. Two baseline-monitor interferometers (~2.5km) along LCGT • 2. Sensors and benchmarks for monitoring environmental condition • Purpose and Targets • [Baseline interferometers] • 1. Baseline monitor for LCGT (Tides, earthquakes, crustal deformation…in the middle of Niigata Kobe Tectonic Zone) • 2. Fault-creep monitor for the Atotsu fault • 3. Deep interior of Earth (Monitoring Earth’s free oscillations) • [Sensors and Benchmarks] • Monitoring environmental condition (Thermometers, Barometers, Hygrometers, Broadband seismometers, and Accelerometers) and tunnel deformation (leveling and surveying) • Standard of length (collaboration with AIST) • Benchmarks for vacuum installation

  2. Baseline Interferometers along LCGT

  3. A 2500-m baseline interferometerand a 5-m input baseline

  4. Layout of vacuum system and benchmarks Strain sensitivity ~1e-13 Baseline ~2.5km Chamber diameter 1000mm Chamber height 800mm Vacuum pressure ~1e-4Pa Benchmarks 800x800mm, 200-m separation Sensors Temperature (laser, chamber, vault) Barometer (chamber, vault) Hygrometers (laser) Broadband seismometer (vault) Accelerometer (laser, chamber)

  5. Layout of center chamber

  6. Schedule 2011.10-2013.3 Laser assemble (partially) 2011.10-2013.3 Optics assemble (partially) 2012.11-2013.3 Benchmark, vacuum installation (2nd tunnel) 2013.3-2013.7 Benchmark, vacuum installation (1st tunnel) 2013.4-2013.9 Laser and optics installation 2013.4-2013.9 Data acq. sys. Installation 2013.10-2014.3 Observation

  7. Budget FY2011 89.1Myen Laser @10Myen x3 30Myen Retro mirror @10M x4 40M Optics @ x2 FY2012 792.0M Chamber @ x4 Duct @ x(3~5)km Vac. pump @ x10 Vac. misc. @ x4 Benchmark @ x30 Data acq. @ x1