1 / 11

Project STEEL Bridge Program Review 1

Project STEEL Bridge Program Review 1. Advisor Dr. Albright, Dr. Osterberg Industry Representative Andrew Hui Intel. Team Shawn Patterson Chris Wong Kyle Woodard. Overview. Introduction Scorecard Additional Accomplishments Plans Issues/Concerns Conclusions. Introduction.

melindaw
Télécharger la présentation

Project STEEL Bridge Program Review 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project STEEL BridgeProgram Review 1 • Advisor • Dr. Albright, Dr. Osterberg • Industry Representative • Andrew Hui • Intel Team Shawn Patterson Chris Wong Kyle Woodard University of Portland School of Engineering

  2. Overview • Introduction • Scorecard • Additional Accomplishments • Plans • Issues/Concerns • Conclusions University of Portland School of Engineering

  3. Introduction • Digital thermostat to provide food that is always at optimal temperature • Who likes warm/decaying food? • Modern fridges lack accurate temp settings • Digital thermostat • Thermal couple sensor • 7-segment display • User interface University of Portland School of Engineering

  4. Introduction Cont. High Level Design MOSIS University of Portland School of Engineering

  5. Scorecard • Plan for September: • Just get started • Purchase refrigerator • Tie together temperature sensor, MOSIS & user interface • High Level MOSIS Design • Write Func Spec University of Portland School of Engineering

  6. Scorecard Cont. • September accomplishments: • Purchased thermocouple • MOSIS • High level design • Comparator, up/down counter & seven segment displays • Func Spec • September shortcomings: • Haven’t actually obtained the fridge yet University of Portland School of Engineering

  7. Additional Accomplishments • Team bonding  • Storming • Norming • Performing • Getting ahead on MOSIS design University of Portland School of Engineering

  8. October Plans • Finish MOSIS design • Order all parts: • A to D converter • Buffer • Amplifier • Display • User-interface • Plan installation of relay University of Portland School of Engineering

  9. Milestones University of Portland School of Engineering

  10. Concerns/Issues • Matching output of A to D converter to desired MOSIS input • Relay • Refrigerator requiring more repairs • Time Management University of Portland School of Engineering

  11. Conclusions • Introduction • Scorecard • Additional Accomplishments • Plans • Issues/Concerns University of Portland School of Engineering

More Related