1 / 4

Shipment Updates for SPEAR3 Magnets and RF System

Get the latest updates on the shipments of SPEAR3 magnets and the successful testing of the 1.2 Megawatt Klystron. Collaborative effort between SLAC and IHEP.

mgrizzle
Télécharger la présentation

Shipment Updates for SPEAR3 Magnets and RF System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles) left the Institute of High Energy Physics (IHEP) April 4 and should arrive at SSRL in early May. One shipment per month is scheduled through the end of this year. The design and fabrication of SPEAR3 magnets is a collaborative effort of SLAC and IHEP.

  2. The 1.2 Megawatt Klystron for the RF system was successfully tested at Marconi Applied Technologies factory in England. The tube arrived at SLAC on April 12 where additional tests are underway.

  3. The prototype magnet support raft for the BM2 section of the standard arc cell arrived April 6. This raft supports 1 dipole, 2 quadrupoles, 1 sextupole, and 2 corrector magnets. Except for correctors, this raft will be assembled with magnets and vacuum chamber within two months. The electron beam welding of the machined vacuum chamber components is in progress.