1 / 34

Avesta World Class Maintenance

2 | September 19, 2012 | Avesta Jernverk, Teknisk Service. Table of contents. Welcome and introductionOutokumpuThe Avesta Works siteBackgrounds Our way to world class maintenance"Our Maximo historyMaintenance analysisMeasures implemented todayResultsQuestions

mitchell
Télécharger la présentation

Avesta World Class Maintenance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Avesta World Class Maintenance AWCM Juni 2008

    2. 2 | September 19, 2012 | Avesta Jernverk, Teknisk Service Table of contents Welcome and introduction Outokumpu The Avesta Works site Backgrounds Our way to world class maintenance Our Maximo history Maintenance analysis Measures implemented today Results Questions & Answers

    3. 3 | September 19, 2012 | Avesta Jernverk, Teknisk Service Outokumpu Stainless steel manufacturer One of the worlds fourth largest producer Operates in 30 countries with plants in Finland, Sweden, Britain and US 8 000 people employed HQ in Espoo Finland

    4. 4 | September 19, 2012 | Avesta Jernverk, Teknisk Service The Avesta Works site Located in Sweden Steel production started in Avesta in 1883 Steel mill for stainless steel coils Steelwork, Continuous Casting, Hot Rolling shop (Steckel Mill), Cold rolling and Completion line Currently 1000 employees Largest company in the region A Technical Services department containing 95 people. Maintenance engineers, experts and mechanics and electricians. Have a 1.5 billion dollar investment coming up during the next 5 years. This will give a completely new plant which is going to double the amount of assets and raise the requirements on an effective and well balanced maintenance.

    5. 5 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    6. 6 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    7. 7 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    8. 8 | September 19, 2012 | Avesta Jernverk, Teknisk Service Flexible tubes Today all manufacturers of flexible tubes uses duplex stainless steels LDX 2101 2304 2205

    9. 9 | September 19, 2012 | Avesta Jernverk, Teknisk Service Backgrounds Our way to world class maintenance Avesta Works has a long tradition of actively working with an effectice maintenance organisation. A maintenance analysis was performed in 2006 containing. An overall analysis of the maintenance work. A number of actions were proposed to improve the maintenance activities to a world class maintenance: Maintenace ,vision and strategy Create a more accurate follow-up, i.e. better documentation and new KPIs that are close to the assets and workers Get continious improvement philosophy in place. It is now time to evaluate what these actions has given in terms of increased equipment up-time and output quality; optimized labor efficiency and equipment maintenance.

    10. 10 | September 19, 2012 | Avesta Jernverk, Teknisk Service Our Maximo history First installation in 1994. Maximo 2,1 Upgraded to Maximo 3.11 in 1999 Upgraded to Maximo 4.01 in 2002 Upgraded to Maximo 6.2. in 2007 (Today 6,2,2) Currently running a very standardized solution 500 users where of 100 concurrent Integrations with SAP, Production systems (for workorder creation) Meridian ( drawings ) Met-Online (hand held) Automated inventory (Pater noster) Documents and drawings shown on screen in Maximo Hand held devices for Work order (routes, job plans, reporting etc.) Inventory (stock taking, issues & returns, receipts etc) Maximo Data Loader for adding data to the system

    11. 11 | September 19, 2012 | Avesta Jernverk, Teknisk Service Maintenance analysis Master Thesis within maintenance and reliability Named the best Master Thesis within maintenance and reliability in 2003. Contained two major topics A technical model for assessing vibrations and their affect on machine reliability. An overall analysis of the maintenance work. A number of actions were proposed to improve the maintenance activities aiming at: Create a more accurate follow-up. Get continious improvement philosophy in place. Create a world class maintenance.

    12. 12 | September 19, 2012 | Avesta Jernverk, Teknisk Service Proposed measures New KPIs Machine close KPIs that the workers easily can understand and influence . Machine close KPIs that can be aggregated into higher level KPIs MTBF, MTTR etc can be aggregated into OEE (Overall Equipment Efficiency) PM/CM quote Improved communication and documentation between different parts of the business Project for better attitudes

    13. 13 | September 19, 2012 | Avesta Jernverk, Teknisk Service Measures implemented today Machine close KPI:s in Start Center and intranet. Other maintenance KPI:s on webb Hand held solution for work orders and inventory Grab hand held, go Route, read Job plan, enter workorder For inventory as well Drawings and documents shown in Maximo AWCM Avesta World Class Maintenance Project for tuning the maintenance processes and activities. OK>1 Tool for continious improvements implemented throughout Outokumpu on initiative from the CEO. Carried out in cross functional teams to improvements. Communication and documentation emphasized in the OK>1 project. Reflection groups for discussing attitudes and treatment

    14. AWCM Avesta World Class Maintenance Oktober 2008

    15. 15 | September 19, 2012 | Avesta Jernverk, Teknisk Service Bakgrund Fljande frbttringsomrden fr Avesta pvisades i den analys av underhllsarbetet i koncernen som ABB gjorde tidigt 2006: Gemensamma ml mellan produktion och underhll vad gller nyckeltal och ansvarsomrden. Srskilja kostnader fr underhll, modifieringar och frbttringar. vergripande strategier fr hur frebyggande underhll ska genomfras och hur underhllsresurserna ska frdelas. Utnyttja mjlig flexibilitet och utveckling genom utbyte av resurser, erfarenhet och kunskap mellan verken. Anvndning av underhllssystemet fr felanmlan, arbetsorder, avrapportering och underlag till uppfljningar och analys

    16. 16 | September 19, 2012 | Avesta Jernverk, Teknisk Service Beslut frn ortsledningen Underhllet fr Avesta Works ska flja beslutade ekonomiska riktlinjer Ett underhll i vrldsklass behvs fr att Outokumpu ska bli den obestridde ledaren inom rostfritt Att underhlla vr produktionsutrustning r en del av vr krnverksamhet Vrt eget underhll ska alltid vara kostnadseffektivare n underhll frn extern leverantr Vi ska anvnda OK 1 och AWCM projekten fr att uppn vra ml

    17. 17 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    18. 18 | September 19, 2012 | Avesta Jernverk, Teknisk Service Utvecklingsprocessen mot underhll i vrldsklass

    19. 19 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    20. 20 | September 19, 2012 | Avesta Jernverk, Teknisk Service Flja planen fr infrandet av OK1 PM ortspelare r styrgrupp fr AWCM och ansvarar fr samordning mot OK1 arbetet AWCM deltar som PECA i PM och AM pelare fr Stlverk, Varmband och KBR ( Peca = underhllsspecialist) AWCM ansvarar fr att: Skerstlla ett gemensamt arbetsstt fr hela Avesta Works Utka antalet underhllsingenjrer med spetskompetens (idag 10st ) Ta hjlp av externa resurser fr att driva genomfrande (Idhammar, SKF) Arbeta fr en orts-/koncerngemensam syn p: Metodstandard (OK 1= Operational exellense ) Systemstandard Nyckeltal (EFNMS Europeean Federation of National Maintenance Societies) Genomfrande

    21. 21 | September 19, 2012 | Avesta Jernverk, Teknisk Service Underhllsorganisationen mts och fljs upp

    22. 22 | September 19, 2012 | Avesta Jernverk, Teknisk Service Orts PM-pelare Ml (att frbttra) Underhllskostnad Antal haverier Teknisk tillgnglighet Funktionsskerhet (MTBF) Underhllsmssighet (MTTR) Underhllsskerhet (MTW)

    23. 23 | September 19, 2012 | Avesta Jernverk, Teknisk Service Genomfrda frbttringar Vi har nu en underhllspolicy med vision, strategi och uppdrag Vi fljer vr Underhllskostnad genom dokumenterad standard Underhllsnyckeltal fljs p score webben (4 st) UH terminologi enligt standard SS-EN 13306 (dok) Nya rapporter har tagits fram fr att stdja pelarnas analysarbete Beskrivning av UH processerna Genomgng av anlggningsstruktur samt ABC klassning r genomfrd p verken Vi redovisar tid och tgrd, uttag av material bde externt som internt p arbetsorder fr att kunna flja kostnader p vra utrustningar OK-1 arbetet igng p alla verk 5 UH ingenjrer gr PECAT utbildning, 3 r utexaminerade

    24. 24 | September 19, 2012 | Avesta Jernverk, Teknisk Service Underhllspolicy

    25. 25 | September 19, 2012 | Avesta Jernverk, Teknisk Service Idag vet vi vilka utrustningar som r viktigast att underhlla

    26. 26 | September 19, 2012 | Avesta Jernverk, Teknisk Service ABC klassning av produktionsutrustning Idag vet vi vilka utrustningar som r viktigast att underhlla

    27. 27 | September 19, 2012 | Avesta Jernverk, Teknisk Service Nyckeltal styrning av underhll

    28. 28 | September 19, 2012 | Avesta Jernverk, Teknisk Service

    29. 29 | September 19, 2012 | Avesta Jernverk, Teknisk Service Nyckeltal - hur mr vr produktionsutrustning?

    30. 30 | September 19, 2012 | Avesta Jernverk, Teknisk Service Underhllsprocesser

    31. 31 | September 19, 2012 | Avesta Jernverk, Teknisk Service Pgende Q3Q4 2008 Planering/beredning av underhllsarbete samordnas genom arbete i OK-1 och AWCM. Viktiga terkommande underhllsarbeten bereds som s.k. job plans vilket innebr att. Vi vet hur lng tid arbetet br ta Vilka reservdelar som behvs Vilka ev. ritningar och vriga dokument Vilka ev. externa tjnster som erfordras Vilka ev. verktyg som erfordras Reservdelsoptimering fr kad underhllsskerhet, OK-1 team i samarbete med orts PM-pelare och AWCM. Frnyad underhllsanalys (SKF) fr att mta vra frbttringar och identifiera kvarvarande brister

    32. 32 | September 19, 2012 | Avesta Jernverk, Teknisk Service Utmaningen! Fortstta att arbeta fr Avesta Underhll i Vrldsklass och se till att frbttringarna blir bestende Frdjupa samarbetet mellan produktion och underhll inom OK1 fr att stdja kunskapsverfrande och infrande av operatrsunderhll Hlla vr budget fr underhllskostnader Skerstlla att vi har bsta tnkbara systemstd fr underhllsverksamheten och dess stdfunktioner (inkp, frrd etc.)

    33. 33 | September 19, 2012 | Avesta Jernverk, Teknisk Service Results KPIs under development for Start Center i Maximo Exempel frn Travers underhlls chef. Maximo startcenter Jonas Back / IBM i version 6.2 ke Burman Outokumpu visar hur man kan flja sina utrustningar vad gller kostnader, miljkrav, besiktningar mm i Maximo. Men ven hur man enkelt med SQL- frgor har kontroll p sitt system.

    34. 34 | September 19, 2012 | Avesta Jernverk, Teknisk Service Questions & Answers