1 / 8

Preparation of Ganga River Basin Management Plan

Preparation of Ganga River Basin Management Plan. Start-up Workshop July 23-24 , 2010. Programme. GRBM: Objective.

modesta
Télécharger la présentation

Preparation of Ganga River Basin Management Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of Ganga River Basin Management Plan Start-up Workshop July 23-24, 2010

  2. Programme

  3. GRBM: Objective Adequate provision of water to accommodate growing population, urbanization, industrialization, agriculture and energy requirements while ensuring that the fundamental aspects of the river system are protected • River must continuously flow ( ) • River must have longitudinal and lateral connectivity • River must have adequate space for its various functions • River must function as an ecological entity

  4. This doctrine has been misunderstood/inappropriately followed!Brought the concept of BOD/COD limits  30 mg/l/250 mg/l. Legalized defecation in water bodies Thirteen actions must be prohibited on arrival at the sacred water of the Ganga, namely: Defecation, ablutions, …….. A Paradigm Shift in Waste Management Practices: Blend of Advanced Technologies with Traditional Wisdom “The illiterate of the 21st century will not be those who cannot read and write, but those who cannot learn, unlearn, and relearn.” -Alvin Toffler “Rethinking the Future”

  5. GRBMP – Some Issues • Annual Water Availability (Present and future including climate change scenarios) V/S Water Demand (Present and Future) • Adequate Storage – On the River, Off the River Ponds/Reservoirs/Ground Water Recharge • Supportive Capacity • E Flow Only in the River, atleast up to Varanasi • Dilution is not the solution to pollution • Point Sources to be completely eliminated and Catchment Protection Strategy to Control Diffused Pollution/Non Point Pollution • Demand Management – • Agriculture/Industrial/Domestic • GAP – Issues  Technology but PLG! • Local Bodies – Low priority for Waste Management! • River Pollution Control Authoriy • Engagement with Stakeholders - Transperancy

  6. Expectations from this Workshop • All team members get good understanding of the overall framework and members of each group fully develop framework for the respective themes • Define role for each team member and assign responsibility to various members • Identify resource requirements for each group member keeping constraint of available budget for each theme • Prepare detailed plan with time schedule, and get ready for first quarter work and deliverables (search for man power, tools, etc.) • Identify data requirements, sources, and format (input/output) • Learn to use communication portal

  7. Thank You !

More Related