1 / 6

GIZ Open Regional Fund – Energy Efficiency

MVP Project progress update Dr. Armin Teskeredzic, Vienna, Austria, 20.05.2014. GIZ Open Regional Fund – Energy Efficiency. MVP – current status in SEE region!. Croatia. Serbia. MVP test phase training held in Croatia, Serbia, Montenegro and Macedonia!

Télécharger la présentation

GIZ Open Regional Fund – Energy Efficiency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MVP Project progress update Dr. Armin Teskeredzic, Vienna, Austria, 20.05.2014. GIZ Open Regional Fund – Energy Efficiency

  2. MVP – current status in SEE region! Croatia Serbia • MVP test phase training held in Croatia, Serbia, Montenegro and Macedonia! • MVP training in Albania and Kosovo* in July 2014! • MVP user manuals for test phase available! • Collection of data on implemented projects! Bosnia and Herzegovina Montenegro Kosovo* Albania Macedonia • B&H – special case! • BU Methodology prepared! • Formal approval! • DB adaptation!

  3. MVP – to be done in 2014! Task 1 Task 2 Task 3 Booklet on implemented energy efficiency projects in SEE region (2 per country)! MVP

  4. MVP as monitoring tool for all administrative levels! Plans Assignments Installation of high performance windows in public buildings. Thermal insulation of external walls and roofs in public buildings. Installation of solar collectors in households. Replacement of magnetic ballasts with electronic ballasts in public lighting. Modernization of boiler rooms in educational buildings. Installation of geothermal heat pumps in existing buildings… SEAP target – CO2 emission reduction! NEEAP target – energy savings! SEAP Implemented projects Registration Targets: ΔCO2 or ΔE?

  5. MVP system – long term perspective! • Croatian SMIV (MVP) – online in July! • Legal preconditions for SMIV (MVP) system in Croatia • A model for SEE region? • More details from Mr Dean Smolar! MVP visibility ;-) 1200 Proposal!

  6. Thank you for your attention! contact: armin.teskeredzic@giz.de +387 (33) 957 500 (957 518) +387 (62) 991 918

More Related