html5-img
1 / 13

Model Data Collection Meeting Announcement

Model Data Collection Meeting Announcement. Entergy Transmission Planning Summit New Orleans, LA July 8, 2004. Goals of Model Data Collection Meeting. Ensure greater accuracy in long-term transmission system models Ensure consistency in load forecasting & data submittal

naava
Télécharger la présentation

Model Data Collection Meeting Announcement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004

  2. Goals of Model Data Collection Meeting • Ensure greater accuracy in long-term transmission system models • Ensure consistency in load forecasting & data submittal • Entergy has proposed a standard format for load-serving entities to submit load and resource forecasts • Provide a forum for transmission customers to provide updated information on their facilities (e.g., generator characteristics, plant load data) • Provide a forum for Entergy to share with stakeholders its approach and philosophy in transmission system planning and modeling

  3. The meeting will cover: • Proposed template for submitting load and resource forecasts • Entergy’s modeling and transmission system planning philosophy • Stakeholders’ concerns and issues regarding system modeling The meeting will NOT cover: • Coordination of load and resource modeling with and for external systems • This process is addressed in Entergy’s participation in the VAST and VST study groups. • Specific study results or models

  4. Tentative Timeline of Model Update Process October Entergy hosts stakeholders meeting to obtain customer input and suggested changes to long-term power flow models Oct. – Dec. Entergy updates models and posts on OASIS Dec. – Feb. Stakeholders provide additional input, suggested revisions, or corrections Mar. – May Entergy incorporates latest changes into models and coordinates model update with other SERC members via the Regional study groups

  5. When: October 26, 2004 9AM to Noon Where: New Orleans (exact location TBD) Participants: Load-Serving Entities within the Entergy Control Area

  6. Load & Resource Workbook • Contact Information • Demand – System • Demand by Bus (Summer) • Demand by Bus (Winter) • Weather Normalization • Capacity (Summer & Winter) • Firm Resource • Firm Transactions • Non-Firm Resources • Additional Information Draft Workbook Template Available on OASIS for Review & Comments http://oasis.e-terrasolutions.com/OASIS/EES/trans_planning_summit_summary.htm

  7. Contact Information

  8. Demand – System Summary • Internal Demand • Standby Demand • Total Internal Demand • Direct Control Load Management • Interruptible Demand • Net Internal Demand

  9. Demand by Bus (Summer & Winter) • PSS/E Bus # • Point of Delivery (Entergy Station Name) • Point of Delivery (Customer Station Name) • MW • MVAr • Power Factor

  10. Weather Normalization

  11. Capacity (Summer & Winter)

  12. Firm and Non-Firm Resources • Generator Name • PSS/E Bus # • PSSE Bus Name • PSSE Machine ID • Jurisdiction • Summer & Winter • Pmax • Pmin • Qmax • Qmin • MW Output Owned • Preferred Dispatch Order

  13. Firm Transactions • OASIS # • Customer Making Request • Point of Receipt • Point of Delivery • Source • Sink • MW Requested • MW Granted • Service • Begin • End • Status • Seller Comments • Renewal Deadline • Renewal Comments

More Related