Kick Off Meeting. City of Pensacola April 18, 2011. Study Purpose Determine the best solution for replacement of the existing bridges and secure FHWA approval of the location and concept design Basis for performing the replacement bridge study Lack of modern safety provisions

naiya
Télécharger la présentation

Kick Off Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kick Off Meeting City of Pensacola April 18, 2011

  2. Study Purpose • Determine the best solution for replacement of the existing bridges and secure FHWA approval of the location and concept design • Basis for performing the replacement bridge study • Lack of modern safety provisions • No facilities for bikes and pedestrians • Does not meet current navigation requirements • Deteriorating conditions indicate that bridges are structurally obsolete • Determine the requirements to meet increasing traffic demands

  3. Planning • Candidate Projects Based on Preliminary Analysis and determination of need • Prioritize Projects • Funding Options/Availability Reviewed/Programming Project Development & Environment Study • Develop Preliminary Alternatives • Assessment of Potential Environmental & Community Impacts • Substantial Public Involvement Initiatives • Preferred Alternative(s) advance to Preliminary Engineering Preliminary Design • Develop up to 30% Design Plans • Additional Public Outreach • Agency Coordination Final Design • Proceed through Design, 60, 90 % plans • Permitting Process • Final Cost Estimates Right-of-Way/ Acquisition • Proceed with acquisition of necessary property Construction

  4. Project Development & Environment Study • Evaluate Current Conditions – Data Collection • Environmental, Social, Engineering • Forecast Future Needs – Traffic • Evaluate Alternative Corridors & Select One • Develop Alternatives Within Selected Corridor • Perform Assessments of Potential Environmental & Community Impacts • Select an Alternative to advance into Preliminary Engineering

  5. Website pensacolabaybridge.com Newsletters One – On – One Meetings CommunityStakeholders Special Interest Groups Neighborhood Associations Local, State & Federal Officials Informal PublicMeetings Project Advisory Group (PAG) • Throughout the study conduct a comprehensive and continuous Public Involvement Program Local Government

  6. Contact US!! www.PensacolaBayBridge.com J.Brandon Bruner, PE Project Development Engineer FDOT, District 3 1074 Highway 90 Chipley, FL 32428 850-415-9625 Joseph.Bruner@dot.state.fl.us Dan Kristoff, PE Project Manager RS&H 10748 Deerwood Park Blvd SouthJacksonville, FL 32256-0597Phone: 904-256-2139 Daniel.Kristoff@rsandh.com Nick Arnio, PE, PTOE Deputy Project Manager RS&H 1701 Hermitage Blvd., Suite 101Tallahassee, FL  32308Phone: 850-558-2800 Nicholi.Arnio@rsandh.com

  7. Kick Off Meeting City of Pensacola April 18, 2011