Proposed Shamrock Environmental Landfill

Proposed Shamrock Environmental Landfill. MPCA Public Informational Meeting October 21, 2010. Tonight’s Presentation. MPCA’s permitting process Staff review process Public comments Moving forward. MPCA Permitting Process. Receive complete application Technical review

nani
Télécharger la présentation

Proposed Shamrock Environmental Landfill

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Shamrock Environmental Landfill MPCA Public Informational Meeting October 21, 2010

  2. Tonight’s Presentation • MPCA’s permitting process • Staff review process • Public comments • Moving forward

  3. MPCA Permitting Process • Receive complete application • Technical review • Preliminary determination • Draft permit • 30 day public notice • Final determination

  4. Engineering Review • Plans Reviewed • Engineering Drawings • Construction Specifications • Facility Operations Plan • Industrial Solid Waste Management Plan • Leachate Management Plan • Stormwater Management Plan • Emergency Response Plan • Contingency Action Plan • Closure Plan • Postclosure Plan

  5. Engineering Review • Technical Aspect • Meets State and Federal regulations • Composite liner • Electrical Leak Location Testing • Waste relocation • Approval needed • MN Rule requires 1000’ setback from federal highway • Recommend approval

  6. Hydrogeologic Review • Phase I • An evaluation of the Published and Unpublished Information that is available for the area. • Phase II • A detailed evaluation of the distribution and properties of the earth materials underlying the site and the groundwater conditions beneath the site.

  7. Hydrogeologic Review • Phase III • Design and Installation of a groundwater monitoring network at the site. • Phase IV • Evaluation of the groundwater quality at the site.

  8. Hydrogeologic Review

  9. Public Comments • Groundwater (65% of the letters received) • Quality • Quantity • Operations (50% of the letters received) • Odor • Dust • Litter • Noise • Landfill gas (12% of the letters received) • Others

  10. Moving Foward • Written Comments • Comment period extended to October 28, 2010 • All file documents are available for review at MPCA-St. Paul • Most of the documents are also available from the city • Permit Issuance • Local approvals/permits are a required permit condition • Final determination will be made after all comments are reviewed

  11. Contact Information • Lisa Mojsiej, Project Engineer • 651-757-2373 lisa.mojsiej@state.mn.us • Alex Hokenson, Project Hydrogeologist • 651-757-2440 alex.hokenson@state.mn.us • Tim Musick, Compliance/Enforcement • 218-302-6615 tim.musick@state.mn.us • Paula Connell, Permitting Unit Supervisor • 651-757-2285 paula.connell@state.mn.us • Heidi Kroening, Compliance Unit Supervisor • 218-302-6620 heidi.kroening@state.mn.us