1 / 11

Coast Guard Logistics Information Management System (CG-LIMS)

Coast Guard Logistics Information Management System (CG-LIMS). CG-9334 | CDR Daniel P. Taylor COMDT | Information Brief | 01 September 2009. Connected Standardized Delivered in segments. Vision

naoko
Télécharger la présentation

Coast Guard Logistics Information Management System (CG-LIMS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coast Guard Logistics Information Management System (CG-LIMS) CG-9334 | CDR Daniel P. Taylor COMDT | Information Brief | 01 September 2009

  2. Connected • Standardized • Delivered in segments Vision To modernize logistics information systems to support common logistics processes across the enterprise UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  3. Connected logistics & finance systems • Properly integrate logistics system with core accounting system. • Integration is greatest project risk. Financial Management (CFO) Data MPC ----------------------------------------------------------------------------------------------------------------- Data CG-LIMS CG-LIMS UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  4. Connected maintenance and supply CG-LIMS • Answers “Do I have the parts to execute the maintenance plan?” + MM SCM TIM CM • Configuration Mgt (CM) and • Technical Information Mgt (TIM) drive • Maintenance Mgt (MM), which drives • Supply Chain Mgt (SCM) UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  5. Connected to deployed assets Support assets operating for extended periods with limited network connectivity UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  6. Standardized product line management O-Level & D-Level CM Total Asset Visibility CG-LIMS Optimized to support common enterprise processes + MM SCM TIM CM CG Modernization Product Line Mgt Enterprise Decisions Availability OpTempo Cost UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  7. Delivered in segments Analyze / Select Obtain/Prod/Deploy Deploy / Support Segment 1: Configuration and Maintenance Management • Discrete segments • Start with CM • Deployed to aviation asset first • Enables continued transformation ADE 2 ADE 3 IOC UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  8. Delivered in segments (notional) Analyze / Select Obtain/Prod/Deploy Deploy / Support Segment 1: Configuration and Maintenance Management ADE 2 ADE 3 IOC Segment 2: Supply Chain Management Analyze/Select Obtain/Prod/Deploy Deploy / Support ADE 2B ORR Segment 3: Technical Data Management Analyze/Select Obtain/Prod/Deploy Deploy/Support ADE 2B ORR Segment 4: Financial Integration Analyze/Select Obtain/Prod/Deploy Deploy/Support ADE 2B ORR Segment 5: HR & Ext Integr’n Analyze/Select Obtain/Prod/Deploy FOC ADE 2B ORR UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  9. iCommandant blog shares vision UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  10. Using enterprise systems for transparent project management UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009

  11. CG-LIMS (OV-1) 24-Aug-2009Coast Guard Logistics Information Management System O-Level & D-Level CM Total Asset Visibility OSC CG-LIMS AOPS MISLE C4ISR & Facilities Others Private Industry Operational Tempo and Availability requirements create demand signal for support which is captured in CG-LIMS; maintenance, parts, and asset status visible to enterprise. Operational assignments and cost will be optimized; relationship measurable; budgets defendable. Financial integration is critical. Financial Management (CFO) Enterprise Decisions Availability OpTempo Data Cost MPC ----------------------------------------------------------------------------------------------------------------- Knowledge Data CG-LIMS Remote Ops support (satellite not included) + MM SCM TIM CM CG Modernization Product Line Mgt Logistics & Service Centers ForceCom OpCom CG-LIMS will support product lines in a Bi-Level maintenance model at the logistics/service centers, with Configuration Mgt (CM) fed by Tech Info Mgt (TIM), capturing Maintenance Mgt (MM) information, which will drive Supply Chain Mgt (SCM) delivering operational capability. DoD & OGA’s

More Related