Innovative Quad-Roundabout Double-Diamond Interchange Design at I-494/TH 169
This paper outlines a groundbreaking design concept for a Quad-Roundabout Double-Diamond Interchange aimed at reducing traffic congestion on TH 169 near Minneapolis, MN. By eliminating three traffic signals that create a daily 3-mile backup, the design proposes replacing them with efficient roundabouts and bridges to enhance traffic flow. The innovative approach maintains access for local traffic while significantly improving average speeds during peak hours. The design demonstrates substantial cost savings and addresses current bottlenecks effectively, showcasing the potential for future implementation.
Innovative Quad-Roundabout Double-Diamond Interchange Design at I-494/TH 169
E N D
Presentation Transcript
Quad-RoundaboutDouble-Diamond Interchange ITS World Congress 2011 Joel K. Marcuson, PE Ulteig Engineering Fargo, ND, USA
Background Concept Developed for Design/Build I-494/TH 169 Project Minneapolis, MN, USA
3 Traffic Signals Create 3mile Backup Every Morning on TH 169 Only Signals on TH 169 Corridor Project Need
Remove 3 Signals and Old-Fashioned Cloverleaf/Signalized Intersection Design Replace with Direct Interchange, Bridges/Roundabouts – Local Traffic 6 Roundabouts = MOT Opportunity Project Description
Keep Through Traffic on I-494 and TH169 Moving Maintain Access to Local Traffic Around and Through Project MOT Objective
Remove Signals Quickly Build Bridges Quickly Run Turning/Local Traffic on Roundabout System MOT Approach
Using Permanent Features (Roundabouts) for New Purpose Accommodates all Traffic and Movements Innovation
Full Access, Improved Traffic Early TH 169 Free Flow I-494 Bottleneck Removed Avg Speeds Doubled Unconstrained Flow – During Construction Benefits of Innovation
Current Need - > Service < System Interchange Quad-Roundabout DD Interchange Fills That Need Results of Innovation
Flooding – Closed All Nearby Crossings Except TH 169 Volumes Increased on TH 169 Restripe 169, Remove Signals Nature Interfered
$5B Deficit Government Shutdown Contractor Stopped Politics Interfered
Contractor Lost Time, Twice Lost Money, Twice New Approach – Build Final Quickly Quad Roundabout DD Abandoned Result
One of Best Designs Never Implemented An Approach That Will Work For Right Occasion/ Right Time Quad-Roundabout DD Interchange
Are Everything Still Want to Share Idea Could be Groundbreaking Timing/Circumstances
Between Service and System High-Performance Service Interchange Significant Cost Savings Signficant Benefits New Category Needed
System Costs = $250-500M High-Performance = $25-50M Similar Results, 10% of Cost $$ Impacts Important
Couldn’t Make it “Not” Work Doubled Traffic – No AppreciableChange in Performance What We Discovered