1 / 7

Add b ext Impact to End Point

Add b ext Impact to End Point. add 10 Mm -1. Option 1: Add International Transport (e.g., 10 Mm -1 ) to Natural Conditions and redraw Glide Path  not allowed by EPA!!. Subtract b ext Impact in 2018. Glide Slope for GRSM. 30.0. subtract 10 Mm -1. subtract 10 Mm -1. 25.0. dV.

neo
Télécharger la présentation

Add b ext Impact to End Point

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Add bext Impact to End Point add 10 Mm-1 Option 1: Add International Transport (e.g., 10 Mm-1) to Natural Conditions and redraw Glide Path  not allowed by EPA!!

  2. Subtract bext Impact in 2018 Glide Slope for GRSM 30.0 subtract 10 Mm-1 subtract 10 Mm-1 25.0 dV 20.0 15.0 10.0 2000 2010 2020 2030 2040 2050 2060 2070 2018 Projection (intl emissions) Default Add bext to each 10 years Option 2: Subtract International Transport (e.g., 10 Mm-1) from 2018 projections

  3. Subtract bext Impact Each 10 Years subtract 10 Mm-1 subtract10 Mm-1 subtract10 Mm-1 subtract10 Mm-1 subtract10 Mm-1 subtract10 Mm-1 2018 Projection (minus bext)

  4. Comparison of Methods 2018 Projection (minus bext) Nearly Identical Results between Option 1 and Option 2

  5. Uniform Rate of Reasonable Progress Glide Path Everglades - 20% Data Days 35 30 25 22.30 21.64 19.97 20 18.30 20.20 Haziness Index (Deciviews) 16.63 18.18 14.97 15 13.30 12.30 10 5 0 2000 2004 2008 2012 2016 2020 2024 2028 2032 2036 2040 2044 2048 2052 2056 2060 2064 Year Glide Path Natural Condition (Worst Days) Observation Method 1 Prediction Method 1 Prediction w/ Intl. Trans. Glide Slope at EVER

  6. Impact of International Transport

More Related