1 / 13

PEREKAYASAAN MAJLIS DAERAH KAMPAR: LESEN PENJAJA

PEREKAYASAAN MAJLIS DAERAH KAMPAR: LESEN PENJAJA. Profil Projek. PROSES ‘AS IS’ i ) Lesen Penjaja ( Tidak Berisiko ). Proses Kerja Semasa (As-Is) Lesen Penjaja. Terima surat tolak. 1.Hantar permohonan.

neviah
Télécharger la présentation

PEREKAYASAAN MAJLIS DAERAH KAMPAR: LESEN PENJAJA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEREKAYASAAN MAJLIS DAERAH KAMPAR: LESEN PENJAJA

  2. ProfilProjek

  3. PROSES ‘AS IS’i) LesenPenjaja (TidakBerisiko)

  4. Proses Kerja Semasa (As-Is) Lesen Penjaja Terimasurattolak 1.Hantar permohonan 3. BayaranProses MP:5 Minit 10. Terimasuratkelulusan MP: 60 minit 11.Terima lesen MM:5minit MP:5 minit MM:480 minit 4.Daftar 5.Buka fail MP:10 Minit MM: 480minit Tak Lengkap 9.1Surat tolakdikeluarkan MP:30 minit MP:5 minit 9. Keluarkansuratkelulusan MP:30 minit MM:5 minit 2.Terima dan Semak MP:10 minit MM: 5 minit MM:10 minit Lengkap MM: 480 minit 7.Penilaian MP: 3O Minit MM: 960 minit MM:480 minit MM: 960 minit 8.Pertimbangan MP:30 minit LULUS 7 HARI 9. Keputusan Tolak Lulus

  5. Value Analysis of Process As-Is Penjaja Rule of Thumb: CVA and BVA – Simplify, Combine and Optimize NVA – Eliminate Interval – Eliminate or optimize

  6. Proses Kerja Semasa (To-Be) Peluang Penambahbaikan Lesen Penjaja Terimasurattolak 1.Hantar permohonan 3. BayaranProses MP:5 Minit 10. Terimasuratkelulusan MP: 60 minit 11.Terima lesen MM:5minit MP:5 minit MP:2mnt MM:480 minit 4.Daftar 5.Buka fail MP:10 Minit MM: 480minit Tak Lengkap 9.1Surat tolakdikeluarkan MP:30 minit MP:5 minit 9. Keluarkansuratkelulusan MP:30 minit MM:5 minit 2.Terima dan Semak MP:10 minit MM: 5 minit MM:10 minit Gabungkanterima,semak ,daftardanbuka fail MP: 8minit Lengkap MM: 480 minit Keluarkansurattolak MP: 10minit MP:10mnt 7.Penilaian MP: 3O Minit MM: 960 minit MM:480 minit Penilaiandanpertimbanganoleh PPKP MP:10mnt MM: 960 minit 8.Pertimbangan MP:30 minit LULUS 7 HARI 9. Keputusan Tolak Lulus

  7. PROSES ‘TO BE’Lesen Penjaja (Tidak Berisiko)

  8. Proses Kerja Semasa (To-Be) Lesen Penjaja Terimasurattolak 6.Terima suratkelulusan MP:2 minit 7.Terima lesen 1.Hantar permohonan MP:5 minit 4.1Surat tolakdikeluarkan MP:10 minit 5.Keluarkan suratkelulusan MP:10 minit 2.Daftar ,buka fail danrujukanagensi MP:8 minit 3.Penilaian danpertimbanagan MP:10 minit 4.Keputusan Tolak Lulus LULUS 30 minit

  9. Value Analysis of Process To-Be Penjaja Rule of Thumb: CVA and BVA – Simplify, Combine and Optimize NVA – Eliminate Interval – Eliminate or optimize

  10. PerbandinganSebelumdanSelepasProjek LESEN Penjaja