1 / 5

W ater defines 7 of 8 county borders touching S.F. Bay

W ater defines 7 of 8 county borders touching S.F. Bay Addressing Sea Level Rise is a shared responsibility . But that doesn ’ t have to mean inaction. Two counties and three cities on the Peninsula . San Francisquito Creek Joint Powers Authority Len Materman, Executive Director.

nguyet
Télécharger la présentation

W ater defines 7 of 8 county borders touching S.F. Bay

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water defines 7 of 8 county borders touching S.F. Bay Addressing Sea Level Rise is a shared responsibility But that doesn’t have to mean inaction Two counties and three cities on the Peninsula San Francisquito Creek Joint Powers Authority Len Materman, Executive Director

  2. Watershed Stanford San Francisquito Creek Palo Alto 50 square miles; two counties; six towns; local, state, & national parks sites; major rail &highways, a regional airport, Postal Service facility, and major research university Menlo Park East Palo Alto Floodplain

  3. Floodplains in Menlo Park, East Palo Alto and Palo Alto Redwood City S.F. Bay East Palo Alto Menlo Park Approximate number of parcels in the 100-year floodplains = creek floodplain only (3,500 parcels) Palo Alto = Bay floodplain only (2,700 parcels) = both floodplains simultaneously (2,200 parcels) 1 mile Mt. View

  4. Protecting people and property from San Francisco Bay to Highway 101 Design objective: 100-year creek flow, 50 years (26”) of SLR, 100-year tide, and 3’ of freeboard • Protects over 1,000 parcels from creek flows and tides exiting channel • Creates 14 acres of new marsh habitat • Enables new golf course and trails • Enables flood protection work upstream • Provides new, safer PG&E gas pipeline East Palo Alto Floodwalls Levees Palo Alto Allows for a restored connection between creek & marshland

  5. Strategy to Advance Flood protection, Ecosystems and Recreation along the Bay SAFER Bay Palo Alto Menlo Park East Palo Alto Ravenswood Ponds Potential horizontal levees with upland transition zone Funders State of CA Cities of East Palo Alto and Menlo Park Facebook, Inc. U.S. Fish & Wildlife Service 30” of SLR with a 100-year Bay tide N Creek 100-year floodplain overlapped with Bay floodplain

More Related