50 likes | 177 Vues
This document summarizes the key outcomes and action items from the UCI collaboration meeting held on April 9, 2005. Emphasis was placed on various technical aspects, including the investigation of third RF cable companies, detailed wiring and interface plans, and the testing of sensor shielding. Discussions also covered gondola certification in Palestine, updated power and mass estimates, integration of solar arrays, and strategies for antenna calibration. The meeting concluded with decisions regarding GPS data accuracy and mechanical parts labeling.
E N D
Action Items UCI ANITA Collaboration Meeting 9 April 2005
1. Investigate third RF cable company • J. Link • Wiring/Interface Plan • J. Link, G. Varner • Plan to test shielding of Kurt’s sensors; David’s • external housekeeping wiring; RFCM power wiring • D. Goldstein, • Discuss gondola certification in Palestine • M. Rosen • Final nadir decision • P. Gorham • Updated power estimate • J. Link • Updated mass estimate • K. Liewer (?)
For TV—check max. Temp. for crate components • J. Link • When will QRH antennas be ready? • Peter, Jason • Ask NSBF about solar array integration • Marc • Investigate possibility of SLAC test (Spring ’06?) • Peter • Plan for antenna calibration considering delivery • schedule (1st 8 horns arrive in May; others not ordered) • Ped • How to get extra digit in GPS data • Saltzberg, Liewer • RF calibration/operations test in Ft. Sumner • D. Saltzberg, S. Barwick, P. Gorham
15. Borehole at Willy field S. Barwick, 16. Mounting plan for GPS antennas Marc, Mike D. 17. Mounting plan for RFCM Marc 18. Which antennas to use for veto; testing and placement of vetos on instrument Peter 19. Ask NSBF about use of rotator during EM, full flights (can we point the instrument?) Jason 20. Finalize mechanical parts labeling scheme Marc 21. Extend UCI housing to August 1 Steve
22. Email dσ/dy distribution functions; investigate existence of updated versions D. Seckel (done!)