Download
action items n.
Skip this Video
Loading SlideShow in 5 Seconds..
Action Items PowerPoint Presentation
Download Presentation
Action Items

Action Items

100 Vues Download Presentation
Télécharger la présentation

Action Items

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Action Items UCI ANITA Collaboration Meeting 9 April 2005

  2. 1. Investigate third RF cable company • J. Link • Wiring/Interface Plan • J. Link, G. Varner • Plan to test shielding of Kurt’s sensors; David’s • external housekeeping wiring; RFCM power wiring • D. Goldstein, • Discuss gondola certification in Palestine • M. Rosen • Final nadir decision • P. Gorham • Updated power estimate • J. Link • Updated mass estimate • K. Liewer (?)

  3. For TV—check max. Temp. for crate components • J. Link • When will QRH antennas be ready? • Peter, Jason • Ask NSBF about solar array integration • Marc • Investigate possibility of SLAC test (Spring ’06?) • Peter • Plan for antenna calibration considering delivery • schedule (1st 8 horns arrive in May; others not ordered) • Ped • How to get extra digit in GPS data • Saltzberg, Liewer • RF calibration/operations test in Ft. Sumner • D. Saltzberg, S. Barwick, P. Gorham

  4. 15. Borehole at Willy field S. Barwick, 16. Mounting plan for GPS antennas Marc, Mike D. 17. Mounting plan for RFCM Marc 18. Which antennas to use for veto; testing and placement of vetos on instrument Peter 19. Ask NSBF about use of rotator during EM, full flights (can we point the instrument?) Jason 20. Finalize mechanical parts labeling scheme Marc 21. Extend UCI housing to August 1 Steve

  5. 22. Email dσ/dy distribution functions; investigate existence of updated versions D. Seckel (done!)